
2026 Changes
June 2026:
This update covers April, May, and June 2026. Before we dive into the
updates to the California Highways site, an update on the California Highways: Route by Route podcast. As always, you can keep up with the show at the podcast's forever home at https://www.caroutebyroute.org , the show's page on Spotify for Podcasters, or you can subscribe through your favorite podcaster or via the RSS feeds (CARxR, Spotify for Podcasters). The following episodes have been posted since the last update on March 27,
2026:
- June | CA RxR 4.12: Route 14, Route 64, LRN 290: The Valley Freeways that Never Happened. Episode 4.12 starts our exploration of the last route of this season: Route 14. Segment (a) of
Route 14 is the unbuilt "Reseda to the Sea" freeway, so we take this
opportunity to discuss the unbuilt freeways of the San Fernando Valley:
the Reseda Freeway (Route 14), the Whitnall Freeway (Route 64), the
Laurel Canyon Freeway (Route 170), and the freeway plans for Sunland
Tujunga, the Angeles National Forest (Route 118, Route 122, Route 249),
and the plan for the Mulholland Expressway (Route 268). We also discuss
LRN 14 (part of US 40) and Sign Route 14 (which became Route 91). We'll
discuss the built portion of Route 14 between I-5 and US 395 in the last
official season 4 episode. With respect to Tom's sound quality: It's
better. Daniel's mic has an occasional "pop" or "thump" problems; we'll
hopefully fix that in Ep 4.13. We're also working to line up 2-3 bonus
episodes during the season break. (Spotify for Creators)
- May | CA RxR 4.11: Route 13: Oakland and Berkeley. With Episode 4.11, our attention turns to Route 13. In this episode, we look
at LRN 13, Sign Route 13, and Route 13. LRN 13 was the Sonora and Mono
Wagon Road, which became today’s Route 219 and Route 108. Sign
Route 13 was short-lived, quickly being renumbered as Sign Route 17 and
Route 17, and is today’s Route 17, I-880, and I-580 N of the Bay
Bridge. The post-1964 Route 13 of today runs from Route 61 to Route 61
through Oakland and Berkeley, and is best known as the Warren Freeway
and Ashby Blvd. As for Route 61, you’ll just have to listen to the
episode. Next time: In Ep 4.12, we’ll look at Route 14 and the
unbuilt freeways of the San Fernando Valley. Lastly, note that in this
episode Tom was having microphone trouble, so his sound is a bit off
(and I don’t know Audacity well enough to fix it). (Spotify for Creators)
- April | CA RxR 4.10: Route 12: Into the Sierras. Episode 4.10 concludes our exploration of Route 12 with an exploration of the final
section of the route: From Route 99 in Lodi to Route 49 near San
Andreas. This is a segment that travels through the foothills of the
Sierras, running through Lodi, Lockeford, Clements, Valley Springs, and
San Andreas along what was originally LRN 24. We also review LRN 12,
which we visited before in our episodes on Route 8, for LRN 12 became
I-8 between San Diego and El Centro. In our next episode, our attention
turns to Route 13, and includes a discussion of LRN 13, the original
Sign Route 13 which was quickly renumbered as Sign Route 17, and
today’s Route 13 which runs through Oakland and Berkeley, although
the route is unconstructed between the Oakland Airport and I-880. (Spotify for Creators)
- March | CA RxR 4.09: Route 12: Crossing the Wetlands. Episode 4.09 continues our exploration of Route 12 through an exploration of the
middle section of the route: From Fairfield/Cordelia through the "Drive
to Stay Alive" corridor, on through the wetlands of Rio Vista, and into
the central valley and Lodi. We explore the big change in routing that
happened in Rio Vista. We also look at some major projects within this
segment, as well as some of the interesting names. We also review LRN 12, which we visited before in our episodes on Route 8, for LRN 12
became I-8 between San Diego and El Centro. Our exploration of Route 12
will conclude in Episode 4.10, which will cover Route 12 from Route 99
to the Sierra Foothill and San Andreas, where it meets Route 49. (Spotify for Creators)
Turning to the updates to the California Highways pages: Updates were
made to the following highways, based on my reading of the (virtual)
papers and my research for the fifth season of the podcast in April, May,
and June 2026 (which are posted to the roadgeeking category at the "Observations Along The Road" and to the California Highways Facebook group) as well as any backed up email changes. I also reviewed the the AAroads forum (Ꜳ). This resulted in changes on the following routes, with credit as indicated [my research(ℱ), contributions
of information or leads (via direct mail or ꜲRoads)
from Tom Fearer(2), Mike Palmer(3), Plutonic
Panda(4) Relaxok(5),
Mike Roberson (Mapmikey)(6)]:
Route 1(ℱ), Route 4(ℱ), I-5(ℱ),
US 6(2), I-10(ℱ), Route 12(ℱ),
I-15(ℱ), Route 20(ℱ), Route 24 (I Street
Bridge)(ℱ), Route 29(ℱ), Route 33(ℱ),
Route 36(ℱ), Route 37(ℱ,5), Route 41(ℱ,2),
Route 46(2), Route 47(ℱ), Route 49(ℱ),
US 50(ℱ), Route 62(ℱ), US 66(ℱ),
Route 67(ℱ), Route 68(ℱ), Route 78(ℱ),
US 80(ℱ,6), Route 92(ℱ), US 97(ℱ),
Route 99(ℱ), US 101(ℱ), Route 102
(Placer Parkway)(ℱ), I-105(ℱ), Route 107(3),
Route 118(2), Route 119(ℱ), Route 120(ℱ,2),
Route 134(ℱ), Route 138(ℱ), Route 138
(High Desert Corridor)(ℱ), Route 150(ℱ),
Route 166(ℱ), Route 168(2), Route 187 - Santa
Monica Pier(4), Route 197(ℱ), US 199(ℱ),
Route 215(ℱ), Route 247(ℱ), US 395(ℱ),
US 399(ℱ,6), US 466(2), I-580(ℱ),
I-605(ℱ), I-710(ℱ), I-805(ℱ),
I-880(ℱ), I-980(ℱ), County Sign Route G5(3),
County Sign Route J8(ℱ).
(Source: private email through 6/25/2026, Highway headline posts
through and including the June 2026 Headline post (up
to "After more than a decade of planning, Glendale has finally approved
a $31M L.A. River bridge to Griffith Park — spanning 320 feet and
opening by 2031" (HL) and "Pyramid Hills Road" (GN)), AARoads through
6/25/2026)
Started work on Season 5 of the Route by Route podcast. Research for and
preparation of the episodes posted or written during this period resulted
in changes and updates to the following routes: LRN 14, I-15, Route 24,
Route 31, US 66, Route 71, Route 79, Route 91, US 95, Route 103, Route 163, Sign Route 195, Route 206, Route 215, Route 252, Route 371, US 395,
I-710, Sign Route 740.
Reviewed the Pending Legislation page, based on the California Legislature site, for bills through 2026-06-20. As usual, I recommend to every Californian
that they visit the legislative website regularly and see what their
legis-critters are doing. As many people are unfamiliar with how the
legislature operates (and why there are so many "non-substantive changes"
and "gut and amend" bills), I've added the legislative calendar (updated for 2026) to the end of the Pending Legislation page. This is early in the even-numbered year session, so
there's a lot of introduction of placeholder bills, and a lot of amending
of those placeholder bills (and bills that remained active from the
previous year). Noted the passage of the following bills / resolutions (I
also identified a number of errors in bills and resolutions, and submitted
comments as indicated):
- AB 2156 (Rivas) Holidays: Farmworkers Day.
Existing law designates specific days as holidays in this state,
including Cesar Chavez Day on March 31, and requires the Governor to
annually proclaim March 31 as Cesar Chavez Day.
This bill would instead designate March 31 as Farmworkers Day and
would require the Governor to annually proclaim March 31 as
Farmworkers Day.
This bill would declare that it is to take effect immediately as an
urgency statute.
03/26/26 Chaptered by
Secretary of State - Chapter 7, Statutes of 2026.
- ACR 81 (DeMaio) Border Patrol Agent Daniel H. Salazar Memorial Highway.
Designate the portion of Route 94 from Potrero Valley Road (SD
41.393) to Bell Valley Truck Trail (SD R44.96) in the County of San
Diego as the “Border Patrol Agent Daniel H. Salazar Memorial
Highway”
04/28/26 Chaptered by
Secretary of State - Res. Chapter 50, Statutes of 2026.
- ACR 96 (Rogers) Assembly Member Patty Berg Memorial Highway.
Designates the portion of US 101 from the 14th Street
Overcrossing № 04-0245 (HUM 86.501) to Turner Draw (HUM 89.181),
in the County of Humboldt, as the “Assembly Member Patty
Berg Memorial Highway”
04/28/26 Chaptered by
Secretary of State - Res. Chapter 51, Statutes of 2026.
- ACR 97 (Rogers) Charlie Barra Memorial Bridge.
Designates the Russian River Bridge and Overhead, Bridge №
10-0310 (MEN 33.6) on Route 20 in the County of Mendocino, as the
“Charlie Barra Memorial Bridge”
04/28/26 Chaptered by
Secretary of State - Res. Chapter 52, Statutes of 2026.
- ACR 101 (Addis) James Dean Memorial Highway.
Designates the portion of Route 46 in the County of San Luis Obispo,
from Cholame (SLO 54.038) to Antelope Road (SLO 58.300) as the “James
Dean Memorial Highway”. This also rescinded the
designation of the Route 41/Route 46 junction as the James Dean
Memorial Junction.
04/28/26 Chaptered by
Secretary of State - Res. Chapter 53, Statutes of 2026.
- ACR 109 (Arambula) Officer Gonzalo Carrasco, Jr., Memorial Highway.
Designates the portion of Route 43 in the City of Selma, from East
Mountain View Avenue (FRE 7.340) to the junction of Route 99 (FRE
9.308) as the “Officer Gonzalo Carrasco Jr., Memorial
Highway”
04/28/26 Chaptered by
Secretary of State - Res. Chapter 54, Statutes of 2026.
Reviewed the online agenda of the California Coastal Commission for the April through June meetings. The following items were of interest:
- Application 6-26-0167: Installation of a suicide
deterrent system, including 8-ft.high wire mesh barrier on top of
existing 34-in.high bridge guardrails, additional substructure
maintenance walkways, replacement of ClosedCircuit Television (CCTV)
cameras, and signage. (Route 75). According to Caltrans, the proposed
deterrent system will consist of an 8-foot-high steel wire mesh barrier
suspended between posts installed on top of the existing 34-inch-high
concrete bridge guardrails. The barrier’s mesh openings are 1-inch
in size and are designed to prevent climbing over the existing bridge
guardrails. In addition, system upgrades will include updated cameras
systems, signage, and an expanded substructure maintenance walkway on
the underside of the bridge. Located within the ecologically important
San Diego Bay, the bridge is within the Pacific Flyway and has served as
seasonal nesting habitat. Construction impacts will be temporary in
nature and Special Condition № 3 requires a Nesting Bird
Monitoring and Avoidance Plan to avoid impacts to nesting birds within
the construction site. Special Condition № 4 requires various BMPs
designed to prevent inadvertent chemical and debris spills. Staff
recommended a YES vote, with conditions.
(Source: June 2026 CCC Agenda, Agenda Item Wednesday, June 10,
2026: 17b)
- Appeal A-4-MAL-26-0011: Appeal by Dr. Thomas G.
Diamantidis of decision of City of Malibu granting permit with
conditions for a limited term (15-18 months) pilot project involving
temporary safety improvements including lane reductions, bicycle lanes
and striping, new signage, two roundabouts (at El Matador Beach Rd &
Encinal Canyon Rd), crosswalks and flashing beacons, and safety lighting
along an approx. 1.2-mile-segment of Route 1 (Pacific Coast Highway)
between Broad Beach Road and La Piedra Beach Road in City of Malibu, Los
Angeles County. (MA-LB). The background noted the following: The Malibu
City Council approved, with conditions, a local coastal development
permit (CDP) requested by the City of Malibu Public Works Department
(City) for a limited term (15-18 months) pilot project involving
temporary traffic safety improvements on Pacific Coast Highway (PCH) in
the City of Malibu in Los Angeles County. The traffic calming safety
improvements are intended to reduce traffic speeds and improve overall
safety and safety for pedestrians and cyclists along an approximately
1.2-mile-long segment of the public right-of-way of PCH between Broad
Beach Road (east end) and La Piedra Beach Road (west end). The
improvements include two new roundabouts (at El Matador Beach Road &
Encinal Canyon Road), reductions in the number of lanes (5 lanes to 2
lanes) and lane narrowing, new bicycle lanes and striping, new
Quick-Kurb bollards for traffic channelization, new signage, new
crosswalks and flashing beacons, and new safety lighting. PCH is owned
by the California Department of Transportation (Caltrans), but these
improvements are a city-led project developed in conjunction with
Caltrans. PCH through Malibu has ongoing safety issues related to high
speeds, limited parking for residents and visitors to coastal
destinations, and limited controlled crossings, sidewalks, and
bike routes. The City has experienced a relatively high rate of fatal
and serious injury collisions compared to similarly sized jurisdictions.
In response, on Jun 22, 2015, the Malibu City Council adopted the 2015
PCH Safety Study that the City developed in partnership with Caltrans.
The study includes recommendations for various measures to improve
safety along the highway corridor to reduce vehicle, bicycle, and
pedestrian conflicts. This project brings forward some elements of the
2015 Safety Study as a pilot project for implementation and analysis of
effectiveness. At the heart of appeal, the appellant Dr. Thomas G.
Diamantidis asserts that the project violates Malibu’s certified
Local Coastal Program (LCP) and the California Coastal Act because it
was approved without sufficient evidence, especially regarding
safety, hazards, and public access impacts. The appellant contends that
lane reductions and roundabouts will reduce traffic capacity, worsen
congestion, and create unsafe conditions along a critical coastal
corridor and primary wildfire evacuation route. He contends that the
project was approved without adequate analyses on those issues, claiming
that the approved roundabouts, particularly at Encinal Canyon
Road, were not recommended in the 2015 PCH Safety Study and the
project lacks essential studies such as traffic modeling, evacuation
analysis, and hazard assessments. The appeal further contends the
project is inconsistent with the public access and recreation
policies of the Coastal Act and the City’s LCP because reduced
roadway capacity and increased congestion could impair coastal access
and discourage use of beach access points and coastal pullouts. The CCC
upheld the local approval.
(Source: June 2026 CCC Agenda, Agenda Item Thursday, June 11, 2026
17a)
I checked California Transportation Commission page for the agenda and results of the May and June 2026 meetings of the California Transportation Commission. As always, note that I tend not to track
items that do not impact these pages — i.e., pavement rehabilitation
or replacement, landscaping, drainage, culverts, roadside facilities,
charging stations, or other things that do not impact the routing or
history, unless they are really significant. As such, the following items
were of interest:
[ Note: ° indicates items that were
below the level of detail for updating the specific route pages; ♠ is an indicator used to keep
track of what has been added to the pages; ❧
indicates the results from the meeting, if the meeting minutes
were available. ]
2.1a. STIP/SHOPP Program/Project Amendments
♠ (May) (1) SHOPP Amendments
for Approval. Request to:
(Related Items under Ref. 2.2c.(1), 2.5b.(1), 2.5b.(2), and 2.5f.)
- Add 44 new projects into the 2026 SHOPP. (2.1a.(1a) and
2.1a.(1b))
- Revise 46 projects currently programmed in the 2026 SHOPP.
(2.1a.(1d) and 2.1a.(1e))
Of these, the following projects/allocation
were at the level of interest for the highway pages (general, these are
significant new structures or changes, as opposed to repair or
rehabilitation in place; additions of bike paths, pedestrian, or
complete street elements; or non-visible changes). “⊘”
indicates phase not authorized.
- (1a) #2. 03-Sut-99 R33.8/36.6, PPNO 03-8385; ProjID 0320000040; EA
0J910. Route 99 Near Live Oak, from 0.2 mile south of Eager Road to
0.6 mile south of Clark Road. Eliminate cross traffic access to
Route 99 from Encinal Road/Live Oak Boulevard, add acceleration lanes
in proximity to railroad crossing, and improve access to Eager Road
Interchange. Concurrent COS allocation under Resolution FP-25-93; May
2026. Allocation ($ × $1000): PA&ED $0; PS&E $540; R/W
Sup $300; Con Sup $1,290; R/W Cap $1,060; Const Cap $10,560; TOTAL
$13,750. BC: 1/4/2027.
- (1a) #3. 10-SJ-4 R24.66/25.07. PPNO 10-3638; ProjID 1023000103; EA
1R130. Route 4 In Stockton, at Jack Tone Road. Construct roundabout.
Concurrent COS allocation under Resolution FP-25-93; May 2026.
Allocation ($ × $1000): PA&ED $1,310; PS&E $2,045; R/W
Sup $479; Con Sup $1,235; R/W Cap $1,901; Const Cap $12,570; TOTAL
$19,540. BC: 3/14/2030.
- (1a) #4. 11-SD-67 R20.873. PPNO 11-1601; ProjID 1124000353; EA
43260. Route 67 Near Poway, at intersection of Route 67 and Mussey
Grade Road. Construct multilane roundabout. Concurrent COS allocation
under Resolution FP-25-93; May 2026. Allocation ($ × $1000):
PA&ED $1,303; PS&E $1,666; R/W Sup $709; Con Sup $2,377; R/W
Cap $531; Const Cap $8,973; TOTAL $15,559. BC: 11/12/2030.
- (1a) #38. 07-LA-27 2.5. PPNO 07-6304; ProjID 0726000211; EA 3XA30.
Route 27 Near city of Los Angeles, at 1.1 miles south of Grand View
Drive. Install drainage culverts. Note: In January 2025, the Palisades
fire caused significant damage to Route 27 within Topanga Canyon.
Following the fire, heavy rainfall events resulted in slope failures,
erosion, debris flows, and clogging of drainage systems. Emergency
Director's Order 07-2XR30 was approved to address the emergency
damage. However, the work to install new culverts as part of the
original scope was unsuccessful due to the contractor's inability to
get through the existing bedrock. This project will bring in a new
contractor to install the drainage culverts and remove that scope from
the original DO under a new supplemental. Allocation ($ × $1000):
PA&ED $0; PS&E $0; R/W Sup $0; Con Sup $250; R/W Cap $0; Const
Cap $2,500; TOTAL $2,750.
- (1a) #39. 07-LA-39 40.8. PPNO 07-6485; ProjID 0726000179; EA 2XX60.
Route 39 Near Fallings Springs, from 3.6 miles south of Route 2.
Reconstruct embankment and repair roadway. Note: In December 2025, a
series of winter storms caused significant storm water runoff
that resulted in erosion of the berm and shoulder, as well as damage
and collapse of the roadway. This project will restore the embankments
and repair the roadway. Allocation ($ × $1000): PA&ED $0;
PS&E $0; R/W Sup $100; Con Sup $330; R/W Cap $100; Const Cap
$1,205; TOTAL $1,735.
- (1b) #1. 06-Fre-99 22.7/R24.4. PPNO 06-8110; ProjID 0624000244; EA
0W801. Route 99 In the city of Fresno, from Belmont Avenue to Clinton
Avenue. Rehabilitate roadway and modify interchanges and structures,
repair or replace culverts, construct retaining walls, and reconstruct
pump plant. (G13 Contingency) Concurrent COS allocation under
Resolution FP-25-93; May 2026. Allocation ($ × $1000): PA&ED
$0; PS&E $3,000; R/W Sup $500; ⊘Con
Sup $22,000; R/W Cap $0; ⊘Const
Cap $178,300; TOTAL $203,600. BC: 2/9/2028.
- (1d) #6. 01-Hum-254 15.04. PPNO 01-4954; ProjID 0125000011; EA
0H245. Route 254 Near Weott, at 0.5 mile south of the Williford Road;
also near Redcrest, at 0.3 mile south of Holmes Flat Road (PM 40.81).
Construct two bridges, reduce sediment loads to South Fork Eel River,
and remove fish passage barriers. Includes federal Culvert Aquatic
Organism Passage (AOP) Grant amount of $5,000,000. Note: Split
environmental mitigation with long-term revegetation and monitoring
work into project EA 0H247/PPNO 01 -3287 from parent project EA
0H245/PPNO 01-4954. Allocation Changes ($ × 1,000): PA&ED $0;
PS&E $0; R/W Sup $0; Con Sup
$2,772 $2,544;
R/W Cap $74; Const Cap $11,883 $11,709; TOTAL
$14,729 $14,327.
- (1d) #12. 02-Mod-299 33.5/37.5. PPNO 02-3841; ProjID 0221000131; EA
2J750. Route 299 Near Alturas, from 1.8 miles west of County Road 75
to 0.4 mile east of Crowder Flat Road. Rehabilitate roadway,
improve curves, construct shoulders, concrete barrier, and guardrail,
and rehabilitate drainage systems. Note: Approximately one-mile
section of the project is adjacent to a wetland area impacted by high
saturated soil conditions. Increase in PS&E costs is due to
additional resources required for comprehensive geotechnical
investigation and specialized design measures to identify unsuitable
subgrade material and adress pavement durability. Allocation Changes
($ × 1000): PA&ED: $1,680; PS&E:
$1,360 $1,860;
R/W $571; R/W Sup $530; Con $14,912; Con Sup: $2,040; Total: $21,093
$21,593 .
- (1d) #18. 02-Sis-96 71.0/71.5. PPNO 02-3660; ProjID 0216000125; EA
0H730. Route 96 Near Hamburg, from 0.2 mile west to 0.3 mile east of
Scott River Bridge № 02-0079. Replace bridge. Note: Additional
PS&E is needed for design of a retaining wall. Additional R/W
Support is needed for utility relocations and permanent acquisitions.
These costs were not captured at the time when the scope of this
project was changed from deck replacement to full bridge replacement.
Allocation Changes ($ × $1000): PA&ED $2,130; PS&E
$2,340
$2,940; R/W Sup $190 $340; Con Sup
$3,860; R/W Cap $543; Const Cap $24,850; TOTAL $33,913
$34,663 .
- (1d) #23. 03-But-191 3.278/3.778. PPNO 03-2710; ProjID 0323000037;
EA 3J930. Route 191 Near Paradise, from 0.2 mile south to 0.2 mile
north of Durham Pentz Road. Make roundabout improvements to improve
safety. Concurrent COS allocation under Resolution FP-25-93; May 2026.
Note: Delay project by one year due to delay in the environmental
document. The presence of vernal pools was previously not known,
which requires consultation with US Fish and Wildlife Service and has
elevated the CEQA environmental document from CE to IS/ND. Increase in
R/W capital is due to the presence of vernal pools that increased the
acquisition and mitigation costs. Allocation Changes ($ × $1000):
PA&ED $1,090; PS&E $1,020; R/W Sup $420; Con Sup $1,360
FY26-27
FY27-28; R/W Cap $290 $1,022 FY26-27
FY27-28; Const Cap: $4,720 FY26-27 FY27-28;
TOTAL $8,900 $9,632 .
- (1d) #24. 03-Nev-20 R17.2/R17.8. PPNO 03-4010; ProjID 0325000147; EA
1N900. Route 20 In Nevada City, at the intersection with Route 49/Uren
Street. Construct roundabout. Note: Correct an error in R/W capital
and construction support costs. The two amounts were interchanged at
the time of programming. Allocation ($ × $1000): PA&ED
$1,370; PS&E $1,560; R/W Sup $160; Con Sup
$350 $1,630;
R/W Cap $1,630 $350; Const Cap $5,000; TOTAL
$10,070.
♠ (Jun) (1) SHOPP
Amendments for Approval: Request to:
(Related Items under Ref. 2.5b.(1), 2.5b.(2), and 2.8a.(1))
- Add
36 35 new projects into the 2026 SHOPP.
(2.1a.(1a))
- Revise
56 55 projects currently programmed
in the 2026 SHOPP. (2.1a.(1d) and 2.1a.(1e))
Of these, the following projects/allocation
were at the level of interest for the highway pages (general, these are
significant new structures or changes, as opposed to repair or
rehabilitation in place; additions of bike paths, pedestrian, or
complete street elements; or non-visible changes). “⊘”
indicates phase not authorized.
- (1a) #3. 02-Las-395 R19.0/25.6. PPNO 02-3970; ProjID 0226000020; EA
3K150. US 395 Near Doyle, from 4.0 miles south to 2.6 miles north of
Doyle Overhead. Construct paved median with concrete barrier,
provide buffer zones, place rumble strips, improve clear recovery
zones, and construct truck turnouts. Concurrent COS allocation under
Resolution FP-25-106; June 2026. Allocation ($ × $1000):
PA&ED $3,680; PS&E $2,200; R/W Sup $330; Con Sup $5,450; R/W
Cap $4,877; Const Cap $27,540; TOTAL $44,097. BC: 10/23/2029.
- (1a) #4. 03-But-99 8.2/8.6. PPNO 03-2447; ProjID 0323000302; EA
0N010. Route 99 Near Biggs, at the intersection with Rio Bonito Road.
Construct roundabout. Concurrent COS allocation under Resolution
FP-25-106; June 2026. Allocation ($ × $1000): PA&ED $1,420;
PS&E $1,230; R/W Sup $520; Con Sup $1,430; R/W Cap $680; Const Cap
$7,070; TOTAL $12,350. BC: 2/12/2029.
- (1a) #9. 07-LA-2 2.6/2.9. PPNO 07-5974; ProjID 0722000230; EA 38750.
Route 2 In city of Los Angeles, from Bundy Drive to Westgate Avenue.
Construct bicycle lanes, low-profile concrete barriers and relocate
two traffic signals. Concurrent COS allocation under Resolution
FP-25-106; June 2026. Allocation ($ × $1000): PA&ED $983;
PS&E $1,981; R/W Sup $20; Con Sup $1,262; R/W Cap $7; Const Cap
$4,399; TOTAL $8,652. BC: 5/17/2030.
- (1a) #28. 07-Ven-150 28.610. PPNO 07-6275; ProjID 0724000157; EA
50150. Route 150 Near Santa Paula, at Santa Paula Creek Bridge №
52-0105. Replace bridge, reconstruct fish passage system and restore
creek bed. Concurrent COS allocation under Resolution FP-25-106; June
2026. Future SB 1 Baseline Agreement required. Allocation ($ ×
$1000): PA&ED $3,125; PS&E $4,939; R/W Sup $502; ⊘Con
Sup $10,676; ⊘R/W Cap
$6,423; ⊘Const Cap
$38,266; TOTAL $63,931. BC: 12/5/2031. ⊘”
indicates phase not authorized.
- (1a) #36. 01-Hum-101 86.7/87.1. PPNO 01-3297; ProjID 0126000099; EA
0R100. US 101 In Arcata, at Sunset Avenue Overcrossing. Reconstruct
Sunset Ave interchange by replacing three stop-controlled
intersections with two roundabouts, and construct improved bicycle and
pedestrian facilities. This is Financial Contribution Only (FCO)
to the City of Arcata from a Federal Build Grant. Allocation ($ ×
$1000): PA&ED $0; PS&E $0; R/W Sup $0; Con Sup $0; R/W Cap $0;
Const Cap $14,934; TOTAL $14,934. BC 5/13/2027.
- (1d) #2. 01-Hum-101 79.5/80.2. PPNO 01-2600; ProjID 0123000066; EA
0M760. US 101 In Eureka, at the Eureka Slough Bridge №s 04
-0022L/R. Replace bridges. Note: Additional design costs are required
due to the need to change the location of the detour bridge,
complexity of traffic staging and handling plans, and high seismic
hazard and three distinct geological zones requiring additional
geotechnical investigations. Allocation changes ($ × $1000):
PA&ED $9,950; PS&E
$5,822 $7,719; R/W
Sup $573; ⊘Con Sup
$15,400; R/W Cap $9,055; ⊘Const
Cap $130,000; TOTAL $170,800 $172,697. ⊘” indicates phase
not authorized.
- (1d) #3. 01-Lak-20 36.3/R44.2. PPNO 01-3217; ProjID 0122000135; EA
0M310. Route 20 Near Clearlake Oaks, from 2.0 miles east of New Long
Valley Road to 0.6 mile east of Walker Ridge Road. Realign curve,
widen shoulders, construct stormwater treatment Best Management
Practices (BMPs), and construct rumble strips. Note: Increase in R/W
Capital is needed for mitigation and in-lieu credit acquisition to
offset the impacts to wetlands. Allocation changes ($ × $1000):
PA&ED $1,592; PS&E $1,391; R/W Sup $391; Con Sup $1,684; R/W
Cap
$72 $153; Const Cap $6,956; TOTAL $12,086
$12,167.
- (1d) #13. 04-Ala-24 R
5.85.7/R6.2. PPNO
04-0480B; ProjID 0414000011; EA 0J540. In Orinda, at the Caldecott
Tunnel № 28-0015R, 28 -0015, and 28-0015L; also in Contra Costa
at Caldecott Tunnel (R0.0/R0.60.7).
Rehabilitate and upgrade ventilation system of Caldecott Tunnel Bores
1, 2, and 3. This is a Construction Manager/General Contractor
(CMGC) project. Note: Increase in construction capital to add
underdrain system upgrades in Bores 1 to 3. Split electronic
communication integration work into project EA 0J541/PPNO 04-3924W
from parent project EA 0J540/PPNO 04-0480B. Adjust
postmiles at starting and ending project limits for traffic switching
and traffic control work during extended tunnel closure. Update
description to show CMGC delivery method. Allocation changes ($ ×
$1000): PA&ED $6,269; PS&E $14,400; R/W Sup $184; Con Sup
$20,850; R/W Cap $253; Const Cap $200,652 $203,402;
TOTAL $242,608 $245,358.
- (1d) #19. 04-Son-116 21.6/R22.6. PPNO 04-2029L; ProjID 0419000234;
EA 3Q640. Route 116 Near Sebastopol, at the intersection with Green
Valley Road. Construct intersection improvements. Note: Update
construction capital due to updated refined estimate based on the
final design and additional Transportation Management System (TMS)
elements and drainage systems. Decrease right of way capital due to
refined roundabout layout that significantly reduced right of way
impacts. Delay delivery year by one year to complete right of way
acquisitions. Update performance measures to reflect the new
methodology. Allocation changes ($ × 1,000): PA&ED $1,307;
PS&E $1,739; R/W Sup $598; Con Sup $1,830
FY26-27 FY27-28;
R/W Cap $7,436 $3,200 FY26-27 FY27-28;
Const Cap $8,787 $9,913 FY26-27 FY27-28;
TOTAL $21,697 $18,587.
- (1d) #46. 10-SJ-5 25.6/28.0. PPNO 10-3133B; ProjID 1020000077; EA
0X462. I-5 In Stockton, at the Stockton Channel Viaduct Bridge №
29-0176R, from Route 4 West to Mount Diablo Avenue. Bridge
replacement to address lightweight concrete deck deterioration,
superstructure deficiencies and load carrying capacity deficiencies,
and West Fremont Street/North Pershing Avenue interchange
modifications (roundabout) including Park Street Undercrossing №
29-0202S demolition. This is a Construction Manager/General Contractor
(CMGC) project. Note: Update delivery year based on current schedule.
Allocation ($×$1000): PA&ED $0; PS&E $0; R/W Sup $1,141;
Con Sup $8,296
FY26-27 FY27-28; R/W Cap $0; Const Cap: $327,904 FY26-27
FY27-28; TOTAL $337,341.
♠ (Jun) (3) State
Transportation Improvement Program (STIP) Amendment for Action: The
Department and the Los Angeles County Metropolitan Transportation
Authority, and the Southern California Association of Governments
propose to amend the State Route 138 Multimodal Mobility Improvements
(Segment 4) project (PPNO 4353) in Los Angeles County, to reprogram the
Construction phase from Fiscal Year 2026-27 to 2027-28.
2.1b. STIP Program/Project Amendments/Approvals
for Notice
♠ (May) (3) STIP Amendment
for Notice: The Department and the Los Angeles County Metropolitan
Transportation Authority, and the Southern California Association of
Governments propose to amend the State Route 138 Multimodal Mobility
Improvements (Segment 4) project (PPNO 4353) in Los Angeles County, to
reprogram the Construction phase from Fiscal Year 2026-27 to 2027-28.
- Note: See 2.1a (Jun) (3) above.
♠ (May) (8) STIP Amendment
for Notice: The Metropolitan Transportation Commission proposes to amend
the 2026 STIP to program an AB 3090 reimbursement project (PPNO 2364U)
in order to use local funds for construction of the State Route 37 Sears
Point to Mare Island Improvement Project Phase 1 (PPNO 2364E) in Sonoma
County, with reimbursement to be scheduled over a 2-year period
beginning in Fiscal Year 2029-30.
- Note: In June 2026, there was a request to amend the period of
project allocation for the State-Administered LTCAP Resilient Route 37 Sears Point to Mare Island Improvement project, on the State
Highway System, in various counties. (PPNO 2364E), Agenda Item
2.8v.(14). There was also an item under June 2026 2.2c.(3), Approval
for Future Consideration of Funding.
♠ (Jun) (2) STIP Amendment
for Notice: The Department proposes to amend the STIP Fix 5 Cascade
Gateway / I-5 Improvements Shasta project, in Shasta and Tehama
Counties, to modify the scope. (PPNO 3597)
(Related Item under 2.1s.(4))
2.1s. Trade Corridor Enhancement Program Amendment
(TCEP)
♠ (Jun) (4) TCEP –
Project Scope Amendment. The Department proposes to amend the TCEP Fix 5
Cascade Gateway / I-5 Improvements Shasta project, in Shasta and Tehama
Counties, to modify the scope. (PPNO 3597)
(Related Item under 2.1b.(2))
2.2a. Submittal of Notice of Preparation for
Comments
There were no items of interest for this agenda item in the reviewed
minutes.
2.2b. Submittal of Notice of Documents Available
for Comment (DEIRs)
There were no items of interest for this agenda item in the reviewed
minutes.
2.2c. Approval of Projects for New Public Road
Connection / Future Consideration of Funding
♠ (May) (1) Approval of 10
Projects for Future Consideration of Funding: (° indicates items
that were below the level of detail for updating the specific route
pages)
- °01-01-DN-101, PM M0.0/46.5. Culvert
Rehabilitation and Fish Passage Project. Rehabilitate drainage
systems and provide fish passage on US 101 in Del Norte County between
Post Miles M0.0 and 46.5. (ND) (PPNO 1142) (SHOPP)
(Related Items under Ref.: 2.1a.(1) and 2.5b.(2))
- 02-02-Sha-299, PM 13.55/14.58. Whiskey Creek
Bridge Emergency Repair Project. Replace the Whiskey Creek
Bridge (№ 06-0096) on Route 299 in Shasta County between Post
Miles 13.55 and 14.58 west of Redding. (MND) (PPNO 3933) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- 03-03-But-191, PM 3.28/3.78. Durham Pentz
Intersection. Improve the Durham Pentz Road Intersection on
Route 191 in Butte County between Post Miles (PM) 3.28 and 3.78 south
of Paradise. Specifically, replace existing temporary roundabout
with a permanent roundabout with a larger inscribed circle diameter,
raised splitter islands, raised truck apron, chicanes, lighting
improvements, modified flashing beacons, upgraded count station,
upgraded signs, striping, drainage, and construction of Maintenance
Vehicle Pullouts at PM 3.39 and 3.68. (ND) (PPNO 2710) (SHOPP)
(Related Items under Ref.: 2.1a.(1) and 2.5b.(2))
- 04-04-SM-1, PM 13.1/13.9. Pescadero Minor
Realignment Project. Road realignment on Route 1 near Pescadero
Creek Road in San Mateo County from Post Mile 13.1 to Post Mile 13.9.
(MND) (PPNO 2916Q) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- 05-08-Riv-10, PM R53.9/R55.5. Interstate 10/Monroe Street Interchange Improvement Project. Construction
of interchange improvements at I-10 and Monroe Street located at Post
Mile (PM) Revised (R) 54.7, between PM R53.9 and PM R55.5 on I-10 in
the City of Indio, County of Riverside, California. Specifically,
reconstruct and widen Monroe Street at I-10 from two to four through
lanes on Monroe Street between the Coachella Valley Stormwater Channel
and Avenue 42, reconstruct and widen the on and off ramps to two or
three lanes at the intersection with Monroe Street, construct an
eastbound auxiliary lane between Monroe Street and Jackson Street on
I-10, and extend the on and off ramps with acceleration and
deceleration lanes. (MND) (PPNO 3017W) (STIP) (LPP (Formulaic)) (ATP)
- °06-08-SBd-18, PM 31.7/49.3. State Route 18 Roadway Improvements Project. Conduct roadway improvements
and upgrades along Route 18 from Post Mile 31.7 to 49.3 in San
Bernardino County, California. Specifically, conduct minor
pavement rehabilitation, mill and overlay pavement, localized digouts,
repair rock slope protection, install reinforcement embankment for
slopes, upgrade end treatment and guardrails, upgrade 32 curb ramps to
Americans with Disabilities Act (ADA) standards, install sidewalk,
replace two types of culverts, install corrugated metal pipe and
masonry pipe, backfill erosion features, reconstruct a retaining wall
with geogrid and replace crash cushion. (ND) (PPNO 3018T) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- °07-08-SBd-62, PM 70.0/79.5; 08-Riv-62, PM
79.5/85.0. State Route 62 Pavement Preservation. Pavement
preservation on Route 62 from post miles (PM) 70.0 to 79.5 in San
Bernardino County and from PM 79.5 to 85.0 in Riverside County. (ND)
(PPNO 3017Y) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- °08-09-Iny-168, PM 16.0/16.8. Manor
Market Complete Streets. Construct Americans with Disabilities
Act-accessible pedestrian facilities on Route 168 from post miles 16.0
to 16.8 in Inyo County. (ND) (PPNO 2688) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- °09-09-Ker-58, PM R99.4/R107.7. Cache
Creek Pavement. Preserve, repair, and extend the service life
of the existing pavement and improve ride quality on Route 58 in Kern
County, California. (MND) (PPNO 2717) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- °10-12-Ora-74, PM 0.0/11.5. State Route 74 Multi Asset Project. Address a range of improvements,
including roadway, traffic safety devices, complete streets elements,
and drainage systems from Route 74/I-5 separation (Post Mile (PM) 0.0)
to 1 mile east of San Juan Creek (PM 11.5), in Orange County.
Specifically, conduct pavement and drainage rehabilitation, add curve
warning signs, upgrade guardrail materials and ladder crosswalks, add
a 2-foot buffer between existing general purpose lane and class II
bike lane, and add class II bike lane pavement markings. (ND) (PPNO
4097D) (SHOPP)
(Related Items under Ref.: 2.1a.(1) and 2.5b.(2))
♠ (May) (2) Approval of
Project for Consideration of Funding: 01-11-SD-75, PM R20.1/R22.3;
11-SD-5, PM R13.8/R14.3. San Diego – Coronado Bay Bridge
Suicide Deterrent Project. Suicide deterrent installation and
transportation management system upgrades on Route 75 from post miles
(PM) R20.1 to R22.3 and I-5 from PM R13.8 to R14.3 in San Diego County.
(MND Addendum) (PPNO 1352) (SHOPP)
♠ (Jun) (1) Approval of Four
Projects for Future Consideration of Funding: (° indicates items
that were below the level of detail for updating the specific route
pages)
- °01-05-SB-1, PM 23.000/29.891. Vandenberg
Village Pavement Preservation Project (CAPM). Pavement
rehabilitation project on State Route 1 in Santa Barbara County, from
post mile 23.000 to 29.891. (MND) (PPNO 3055) (SHOPP)
(Related Item under Ref. 2.5b.(2))
- 02-06-Tul-65, PM 29.0/R30.4; 06-Tul-198, PM
R19.5/20.0; 06-Tul-245, PM 0.0/0.2. Lindsay Route 65 and Route 198/245 Operational Improvements Project. Make operational
improvements on Route 65 from post mile (PM) 29.0 to R30.4, Route 198
from PM R19.5 to 20.0, and Route 245 from PM 0.0 to 0.2, in Tulare
County. Specifically, the project includes, in the City of Linsay,
construction of a roundabouts on Route 65 near Tulare Road,
realignment of Route 65 from Avenue 224 (Lindmore Street) to just east
of Cedar Avenue, and construction of roundabouts on the new alignment
at Hermosa Street and the Route 65 connection; near the City of
Exeter, the project includes construction of a roundabout at the
junction of Route 198 and Route 245. (ND) (PPNO 0104A) (STIP)
(LPP) (Formulaic)
(Related Items under Ref. 2.5s.(16) and 4.20)
- °03-08-SBd-40, PM R15.0/R28.8. Interstate 40 Minor Pavement Rehabilitation Project. Conduct minor
pavement rehabilitation on I-40 in San Bernardino County, California.
(MND) (PPNO 3018R) (SHOPP)
(Related Item under Ref. 2.5b.(2))
- °04-09-Mno-203, PM L0.0/R8.7. 203
Pavement. Preserve pavement, stabilize shoulders, restore
drainage facilities, replace guardrails, replace curb ramps, and
replace a radar speed feedback sign on Route 203, from post miles L0.0
to R8.7, in Mammoth Lakes (Mono County), California. (ND) (PPNO 2712)
(SHOPP)
(Related Item under Ref. 2.5b.(2))
♠ (Jun) (2) Approval of Four
Projects for Future Consideration of Funding: (° indicates items
that were below the level of detail for updating the specific route
pages)
- 01-04-Mrn-37, PM R11.2/13.8. State Route 37
Flood
Protection Reduction Project. Build
resiliency to the effects of 2130 sea level rise and stormwater
overtopping onto Route 37 from post Mile R11.2 to 13.8. Specifically,
elevate approximately 2.5 miles of Route 37 on a causeway, including
replacement of the Novato Creek Bridge. (FEIR Addendum) (PPNO 5200)
(SHOPP)
- 02-05-Mon-156, PM R0.9/T5.2; 05-Mon-101, PM
94.6/96.8. Route 156 West Corridor. Realign and widen Route 156 between US 101 and west of Castroville Boulevard from two lanes to
four lanes and rebuild Route 156/Castroville Boulevard interchange in
Monterey County. (FEIR Addenda) (PPNO 0057D) (STIP) (LPP) (Formulaic)
(LPP) (Competitive) (TCEP)
(Related Items under Ref. 2.5s.(15), and 4.20)
- 03-07-LA-605, PM R18.9/R19.5. Interstate 605/Valley Boulevard Interchange Improvements Project. Improve
the I-605/Valley Boulevard Interchange from post mile R18.9 to R19.5,
including reconfiguring, widening, and modifying freeway
on-/off-ramps, improvements to Valley Blvd and Temple Ave, ADA
upgrades, new signals, and bike/pedestrian enhancements. (ND Addendum)
(PPNO 4382) (TCEP)
(Related Item under Ref. 2.5s.(7))
- 04-10-SJ-5, PM 25.6/28.0; 10-SJ-4, PM 15.7/16.2. Stockton
Channel Viaduct Bridge Improvements. Replace the northbound and
southbound Stockton Channel Viaduct Bridges (Bridge № 29-0176L
and Bridge № 29-0176R) in the City of Stockton on I-5 from post
mile 25.6 to 28.0. (MND Addendum) (PPNO 3133) (SHOPP)
♠ (Jun) (3) Approval of
Project for Future Consideration of Funding: 04-Son-37, PM 2.4/6.2;
04-Sol-37, PM 0.0/8.5; 04-Son-121, PM 0.0/0.2. State Route 37 Sears
Point to Mare Island Improvement Project. Reconfigure the
existing Route 37 highway lanes from west of the Route 121 intersection
to the Walnut Avenue Overcrossing at Mare Island; replace the Tolay
Creek Bridge; construct additional through lanes to provide two lanes
(tolled general purpose and High Occupancy Vehicle) in each direction;
construct 8-foot shoulders (except at Sonoma Creek Bridge, which would
have 4- foot shoulders); widen the Sonoma Creek Bridge; signalize the
Route 37/Noble Road intersection; and enhance the degraded marsh habitat
at Strip Marsh East, located south of Route 37. (Addendum and
Supplemental FEIR) (PPNO 2911K) (PPNO 2364E) (SHOPP) (STIP) (LTCAP)
(Related Items under Ref. 2.8v.(14) and 2.8v.(15))
2.3a. Route Adoptions
There were no items of interest for this agenda item in the reviewed
minutes.
2.3b. New Public Road Connection
There were no items of interest for this agenda item in the reviewed
minutes.
2.3c. Relinquishments
There were no items of interest for this agenda item in the reviewed
minutes.
2.3d. Vacations
♠ (Jun) One Vacation
Resolution: 04-Son-12-PM 41.25. Right of way along Route 12 near the
intersection of Broadway and Fremont Drive, in the County of
Sonoma.
2.5a Minor Projects
There were no items of interest for this agenda item in the reviewed
minutes.
2.5b. Financial Allocations for SHOPP Projects /
Federal Discretionary Grant Funds
♠ (May) (2) Request of
$75,692,000 for 59 2026 SHOPP preconstruction project phases for
environmental support, design, and R/W support, as follows:
(Related Items under Ref.: 2.1a.(1), 2.2c.(1), 2.5b.(1), and
2.5d.(1))
- (2a) $42,575,000 for 34 SHOPP support phases
- (2b) $33,117,000 for 25 SHOPP Senate Bill 1 (SB 1) support phases
Of these, the following were of interest for the
highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- (2a) #1. $500,000. 02-Sha-299 13.55/14.58. PPNO 02-3933; ProjID
0225000023; EA 2K000. Route 299 Near Shasta, from 0.3 mile west of
Whiskey Creek Road to 0.1 mile east of Lake Vista Overlook at Whiskey
Creek (Whiskeytown Lake) Bridge № 06-0096. Remove existing
superstructure due to deficient welds found in the fracture critical
steel girders, construct new superstructure with bike lanes and
shoulders on existing piers and abutments, and improve horizontal
alignment at bridge approaches. This project will utilize the
Informal Bid contract method. Concurrent consideration of funding
under Resolution E-26-19; May 2026. Pre-Construction Phase Allocation
($ × $1000): Budgeted (Actual, if different):
PS&E $450; RW Sup $50.
- (2a) #2. $1,580,000. 03-But-191 3.278/3.778. PPNO 03-2710; ProjID
0323000037; EA 3J930. Route 191 Near Paradise, from 0.2 mile south to
0.2 mile north of Durham Pentz Road. Make roundabout
improvements to improve safety. Concurrent consideration of funding
under Resolution E-26-20; May 2026. Concurrent Amendment under SHOPP
Amendment 26H-001; May 2026. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PS&E $1,020 ($1,101); RW Sup $420 ($479).
- (2a) #5. $840,000. 03-Sut-99 R33.8/36.6. PPNO 03-8385; ProjID
0320000040; EA 0J910. Route 99 Near Live Oak, from 0.2 mile south of
Eager Road to 0.6 mile south of Clark Road. Eliminate cross
traffic access to Route 99 from Encinal Road/Live Oak Boulevard, add
acceleration lanes in proximity to railroad crossing, and improve
access to Eager Road Interchange. Future consideration of funding
approved under Resolution E-22-77; October 2022. Concurrent Amendment
under SHOPP Amendment 26H-001; May 2026. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PS&E $540; RW Sup $300.
- (2a) #7. $2,442,000. 04-SM-1 13.1/13.6. PPNO 04-2916Q; ProjID
0422000443; EA 1Y180. Route 1 Near Pescadero, from 0.5 mile south of
Pescadero Creek Road to Pescadero Creek Road. Realign roadway
inland to address sea level rise and eroding bluff. Concurrent
consideration of funding under Resolution E-26-21; May 2026.
Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): PS&E $1,720 ($2,020);
RW Sup $360 ($422).
- (2a) #18. $1,310,000. 10-SJ-4 R24.66/25.07. PPNO 10-3638; ProjID
1023000103; EA 1R130. Route 4 In Stockton, at Jack Tone Road.
Construct roundabout. Concurrent Amendment under SHOPP Amendment
26H-001; May 2026. Pre-Construction Phase Allocation ($ × $1000):
Budgeted (Actual, if different): PA&ED $1,310.
- (2a) #19. $1,303,000. 11-SD-67 R20.873. PPNO 11-1601; ProjID
1124000353; EA 43260. Route 67 Near Poway, at intersection of Route 67
and Mussey Grade Road. Construct multilane roundabout. Concurrent
Amendment under SHOPP Amendment 26H-001; May 2026. Pre-Construction
Phase Allocation ($ × $1000): Budgeted (Actual, if
different): PA&ED $1,303.
- (2b) #8. $3,500.000. 06-Fre-99 22.7/R24.4. PPNO 06-8110; ProjID
0624000244; EA 0W801. Route 99 In the city of Fresno, from Belmont
Avenue to Clinton Avenue. Rehabilitate roadway and modify
interchanges and structures, repair or replace culverts, construct
retaining walls, and reconstruct pumping plant. (G13 Contingency)
Future consideration of funding approved under Resolution E-23-40;
March 2023. Concurrent Amendment under SHOPP Amendment 26H-001; May
2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): PS&E $3,000; RW Sup $500.
♠ (May) (3) Request of
$30,438,000 for 13 2026 SHOPP preconstruction project phases for
environmental support (PA&ED phase). Note
that the CTC didn't make this one easy, just giving a table with
PPNOs, ProjIDs, EAs, and allocations. No route numbers, so I had to
search the 2026 draft SHOPP.
None of these projects were at the level of interest
for the highway pages. So why am I leaving this item in here? To explain
the process, and to explain why I keep track of things like PPNO,
ProjID, and EA. The agenda background for this agenda item contained tables of the form:
| No. |
District |
EA |
PPNO |
Project ID |
Program Code |
PA&ED FY |
PA&ED Cost
(× 1000) |
Additional Months Requested
to Extend PA&ED Completion
Beyond 36 Months |
| 1 |
02 |
1K260 |
3909 |
0224000078 |
201.150 |
26-27 |
$810 |
0 |
I first used a "grep" tool (Astrogrep) to search through my HTML source files for the highway pages to see if
it found the EA, PPNO, or ProjID. Getting nothing, I was unsure the tool
was working.
Next I went out to the actual 2026 SHOPP. There I searched on the EA, and confirmed that each project was below the level of interest. So, for example, for the
project above, 1K260 is:
02-Siskiyou-96 35.66. PPNO 02-3909; ProjID
0224000078; EA 1K260. Route 96 Near Happy Camp, at 1.7 miles east of
USFS Road 15N32; also, near Horse Creek, at 0.6 miles west of Horse
Creek Road (PM 75.45). Install cable net attenuators for rockfall
protection, create catchment area, and rehabilitate drainage systems.
As you can see, this is below the level of interest
for the highway pages. I did this for each of the 13 projects in the
table.
This does make me question the utility of providing
this agenda item in the format for the members of the CTC. Are they
going to take the time to find the details on the projects they are
authorizing? Probably not; rather, they are voting without the real
knowledge. The CTC should go back to using the standard style, as used
for the pre-construction and construction phase allocations (see here
for May 2026 Agenda Item 2.5b.(2)), as that supports the commission members better.
♠ (Jun) (1) Request
$187,140,000 for 10 SHOPP projects — construction project phases
(Con Sup, R/W Cap, Const Cap).
(Related Items under Ref. 2.1a.(1) and 4.10)
Of these, the following were of interest for the
highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- #2. $98,670,000. 02-Sha-299 13.55/14.58. PPNO 02-3933; ProjID
0225000023; EA 2K000. Route 299 Near Shasta, from 0.3 mile west of
Whiskey Creek Road to 0.1 mile east of Lake Vista Overlook at Whiskey
Creek (Whiskeytown Lake) Bridge № 06-0096. Remove existing
superstructure due to deficient welds found in the fracture critical
steel girders, construct new superstructure with bike lanes and
shoulders on existing piers and abutments, and improve horizontal
alignment at bridge approaches. CEQA - MND, 03/10/2026; Re-validation
04/23/2026 NEPA - CE, 03/10/2026; Re-validation 04/23/2026
Future consideration of funding approved under Resolution E-26-19; May
2026. Concurrent SB 1 Baseline Agreement under Resolution
SHOPP-P-2526-07B; June 2026. Pre-Construction Expenditures: Budgeted (Expended):
PA&ED $1,700,000 ($873,685); PS&E
$450,000 ($0); RW Sup $50,000 ($0).
Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): Con Sup $6,500; Const Cap $92,170.
♠ (Jun) (2) Request of
$108,893,000 for 85 2026 SHOPP preconstruction project phases for
environmental support, design, and R/W support, as follows:
(Related Items under Ref. 2.1a.(1) and 2.2c.(1))
- (2a) $47,806,000 for 42 SHOPP support phases
- (2b) $61,087,000 for 43 SHOPP Senate Bill 1 (SB 1) support phases
Of these, the following were of interest for the
highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- (2a) #4. $1,420,000. 03-But-99 8.2/8.6. PPNO 03-2447; ProjID
0323000302; EA 0N010. Route 99 Near Biggs, at the intersection with
Rio Bonito Road. Construct roundabout. Concurrent Amendment
under SHOPP Amendment 26H-002; June 2026. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PA&ED $1,420.
- (2a) #12. $2,530,000. 05-SB-154 R2.2/R2.5. PPNO 05-3224; ProjID
0524000170; EA 1S110. Route 154 Near Los Olivos, from 0.2 mile west to
0.1 mile east of Foxen Canyon Road. Construct roundabout. CEQA -
CE, 3/23/2026. Pre-Construction Phase Allocation ($ × $1000):
Budgeted (Actual, if different): PS&E $2,260 ($2,421);
RW Sup $100 ($109).
- (2a) #14. $983,000. 07-LA-2 2.6/2.9. PPNO 07-5974; ProjID
0722000230; EA 38750. Route 2 In city of Los Angeles, from Bundy Drive
to Westgate Avenue. Construct bicycle lanes, low-profile concrete
barriers and relocate two traffic signals. Concurrent Amendment under
SHOPP Amendment 26H-002; June 2026. Pre-Construction Phase Allocation
($ × $1000): Budgeted (Actual, if different):
PA&ED $983.
- (2a) #17. $3,125,000. 07-Ven-150 28.610. PPNO 07-6275; ProjID
0724000157; EA 50150. Route 150 Near Santa Paula, at Santa Paula Creek
Bridge № 52-0105. Replace bridge, reconstruct fish passage
system and restore creek bed. Concurrent Amendment under SHOPP
Amendment 26H-002; June 2026. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PA&ED $3,125.
- (2a) #21. $2,760,000. 10-Mer-152 16.235. PPNO 10-3598; ProjID
1022000224; EA 1Q040. Route 152 Near Los Banos, at the intersection
with Volta Road. Construct roundabout to improve safety. CEQA - CE,
2/6/2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted
(Actual, if different): PS&E $1,973 ($2,170);
RW Sup $562 ($590).
- (2a) #22. $2,682,000. 10-Mer-165 9.632. PPNO 10-3642; ProjID
1022000225; EA 1Q050. Route 165 In Los Banos, at Willmott Road.
Construct roundabout. CEQA - CE, 11/18/2025. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PS&E $2,279; RW Sup $403.
- (2a) #23. $1,282,000. 10-Tuo-49 25.2/25.3. PPNO 10-3700; ProjID
1026000001; EA 1U650. Route 49 In and near Tuttletown, at 0.5 mile
south of Jackass Hill Road. Modify and widen curve
alignment to meet Surface Transportation Assistance Act (STAA)
standards. Future consideration of funding approved under Resolution
E-19-43; May 2019. Pre-Construction Phase Allocation ($ × $1000):
Budgeted (Actual, if different): PS&E $930; RW
Sup $352.
♠ (Jun) (3) Request
$76,683,000 for three SHOPP projects, programmed in Fiscal Year 2026-27
— construction project phases (Con Sup, R/W Cap, Const Cap).
Of these, the following were of interest for the
highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- #2. $12,531,000. 05-SCr-9 19.2. PPNO 05-2880F; ProjID 0523000059; EA
1K901. Route 9 At the San Lorenzo River, in Castle Rock State
Park. Replace Waterman Gap culvert with a bridge to improve fish
passage. Includes federal Culvert Aquatic Organism Passage (AOP) Grant
amount of $6,000,000. (Additional contribution of $1,000,000 CONST,
$700,000 CON ENG, $300,000 PS&E from State Parks.) CEQA - CE,
05/24/2024; Re-validation 04/22/2026 NEPA - CE, 05/24/2024;
Re-validation 04/22/2026. Pre-Construction Expenditures: Budgeted (Expended):
PA&ED $300,000; PS&E $3,014,000 ($2,828,361);
RW Sup $387,000 ($214,305). Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
Con Sup $2,759; Const Cap $10,802.
113 (Jun) (5) Request of $30,279,000 for 18 2026 SHOPP preconstruction
project phases for environmental support (PA&ED phase). Note
that the CTC didn't make this one easy, just giving a table with
PPNOs, ProjIDs, EAs, and allocations. No route numbers, so I had to
search the 2026 draft SHOPP.
Of these, the following were of interest for the
highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- #8. $2,366,000. 07-LA-39 R31.25. PPNO 07-6226; ProjID 0724000020; EA
39710. Route 39 In Los Angeles County, at North Fork San Gabriel River
Bridge № 53-2245. Replace bridge and realign roadway. (Long Lead
Project). Note: The bridge is located within the Angeles National
Forest and will require coordination with the U.S. Forest Service and
multiple resource agencies. The project involves extensive
environmental studies and permitting, including 404, 401, 402, and
1602 permits. Additional time is needed for environmental document
preparation and bridge design development. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PA&ED $2,366.
- #16. $2,970,000. 07-Ven-1 1.23. PPNO 07-5917; ProjID 0722000037; EA
38190. Route 1 In Ventura County, at Little Sycamore Creek Bridge
№ 52-0012. Replace existing bridge. (Long Lead Project) Note:
The bridge is located along Pacific Coast Highway in Ventura County
and will require extensive environmental studies and permitting. The
project will take at least 24 months to obtain the environmental
document and will require a Coastal Development Permit and a fish
passage study during the design phase. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PA&ED $2,970.
2.5c Financial Allocations for STIP Projects
♠ (May) (5) STIP –
Allocation Amendment. Request to amend the State-Administered STIP Widen
Conventional Highway (Segment 4) project, on Route 138 on the State
Highway System, in Los Angeles County, to revise the project title.
There is no change to the allocation amount. (PPNO 4353)
(Related Item under Ref.: 2.8d.(2))
♠ (Jun) (1) Request an
allocation of $20,000,000 for the RW capital phase for the
State-Administered STIP Route 99/Route 120 Connector Project Phase 1B,
on Route 120, in San Joaquin County, programmed in Fiscal Year 2026-27.
(PPNO 3162B)
♠ (Jun) (2) Request of
$1,250,000 for the locally-administered STIP Western Placerville
Interchanges Phase 2.3 – Westbound Off-Ramp project, on US 50 on
the State Highway System, in El Dorado County. (PPNO 3369)
♠ (Jun) (5) Request of
$84,900,000 for the State-Administered STIP Route 94/Route 125 Auxiliary
Lanes project, on the State Highway System, in San Diego County. (PPNO
0356)
2.5d Allocations for Projects with Costs that
Exceed 20 Percent of the Programmed Amount
There were no items of interest for this agenda item in the reviewed
minutes.
2.5e Supplemental Fund Allocations
♠ (May) (1) Request for an
additional $620,000 (104.2 percent increase) in Pre-Construction
Support, RW Support phase, for the SHOPP Pavement Preservation project
on Route 89, in Plumas County. (EA 3H950, PPNO 3709)
♠ (May) (2) Request for an
additional $4,500,000 (1.4 percent increase) in Construction Capital for
the SHOPP Roadway Rehabilitation and Multimodal Corridor Enhancement
project on US 50, in Sacramento County. (EA 0H08U, PPNO 6254)
♠ (Jun) (1) Request for an
additional $6,789,000 (13.6 percent increase) in Pre-Construction
Support for the Project Approval and Environmental Document (PA&ED)
phase, for the SHOPP Major Damage (Permanent Restoration) project on US 101, in Del Norte County. (EA 0F280, PPNO 1112)
(Related Items under Ref. 2.8a.(1), and 2.8v.(3))
♠ (Jun) (2) Request for an
additional $1,300,000 (21.5 percent increase) in Construction Capital
for the SHOPP Safety Improvements project on Route 49, in Placer County.
(EA 1H240, PPNO 4785)
2.5f Financial Allocations for SHOPP
♠ (May) Informational Reports
on Allocations Under Delegated Authority
(Related Item under Ref. 2.1a.(1))
- Emergency G-11 Allocations (2.5f.(1)): $120,190,000 for 45 projects.
- SHOPP Safety Sub-Allocations (2.5f.(3)): $13,417,000 for four
projects.
- Minor G-19-05a Allocations (2.5f.(4)): $17,569,000 for 18 projects.
The following projects were of interest for
the highway pages. Uninteresting projects included emergency storm
damage mitigation that was primarily repairs; repairing damage from
unhoused individuals; and damage from accidents, because all of these
eventually restore the facility to the condition it was in before the
emergency (and thus there is no new facility or significant change to
the facility).
- (1) #2. $2,750,000. 01-Hum-211 R77.2/78.6. PPNO 01-2598; ProjID
0123000063; EA 0M730. Route 211 Near Ferndale, at Eel River Bridge
№ 04-0134. On December 20, 2022, an earthquake
occurred near Ferndale that caused significant damage to the Eel River
Bridge. The bridge was closed to traffic. The damage
assessments indicate structural damage to the bridge at multiple
piers, columns, girders, and bents. This project will repair the
bridge, replace bridge railing, and place erosion control. As the
Department engineers continued to assess the condition of the bridge,
they discovered that several spandrel walls at the arch abutments had
separated. Stabilizing the spandrel walls required full bridge
closures for 53 hours. Additionally, the crack on Pier 2 has continued
to grow and robust repair strategy is needed. The installation of
seismic gates is also necessary to secure the bridge from future
earthquakes. The first supplemental was necessary to implement this
additional scope. A second supplemental is needed due to
additional damage caused by subsequent earthquakes, flood damage to
the monitoring sensors on the bridge, storage and disposal of
contaminated water, and the need for changeable message signs to warn
the traveling public in case another seismic event occurs. Breakdown:
CON ENG $0; CONST $2,750,000.
- (1) #22. $1,278,000. 05-Mon-1 60.0. PPNO 05-3222; ProjID 0524000162;
EA 1S040. Route 1 Near Notleys Landing, at 0.2 mile south of Rocky
Creek Bridge. On March 30, 2024 a rockslide occurred resulting in
undermining the southbound lanes that required a full road closure,
isolating the community of Big Sur. This project will implement
a one-way traffic control in order to construct a temporary
stabilization of the slope until a follow up engineered solution can
be implemented to fully restore the roadway. As the work
progressed, the seawall repair are beyond the original estimate.
This supplemental will place additional concrete, reinforcing steel,
scaffolding for site access, a crane, and biological monitoring.
This supplemental is needed to closeout a contract that was accepted
1/14/26. Breakdown: CON ENG $278,000; CONST $1,000,000.
- (1) #37. $2,750,000. 07-LA-27 2.5. PPNO 07-6304; ProjID 0726000211;
EA 3XA30. Route 27 Near city of Los Angeles, at 1.1 miles south of
Grand View Drive. In January 2025, the Palisades fire caused
significant damage to Route 27 within Topanga Canyon. Following the
fire, heavy rainfall events resulted in slope failures, erosion,
debris flows, and clogging of drainage systems. Emergency Director's
Order 07-2XR30 was approved to address the emergency damage. However,
the work to install new 84 in. and 72 in diameter culverts as part of
the original scope was unsuccessful due to the contractor's inability
to get through the existing bedrock. This project will bring in
a new contractor to install the drainage culverts and remove that
scope from the original DO under a new supplemental. Breakdown: CON
ENG $250,000; CONST $2,500,000.
- (3) #1. $3,018,000. 01-Lak-29 17.6/18.0. PPNO 01-3216; ProjID
0121000085; EA 0L220. Route 29 Near Twin Lakes, at the intersection
with C Street. Construct left turn lane and an
acceleration lane in the northbound direction. This project will
improve safety and reduce the number and severity of collisions. CEQA
- CE, 11/06/2024; Re-validation 02/23/2026 NEPA - CE, 11/06/2024;
Re-validation 02/23/2026 Allocation Date: 03/06/26 Pre-Construction
Expenditures: Budgeted (Expended): PA&ED
$$1,150,000 ($1,147,657); PS&E $913,000 ($623,807);
RW Sup $97,000 ($5,933). Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
Con Sup $825; Const Cap $1,962.
♠ (Jun) Informational Reports
on Allocations Under Delegated Authority
- Emergency G-11 Allocations (2.5f.(1)): $62,779,000 for 29 projects.
- SHOPP Safety Sub-Allocations (2.5f.(3)): $25,990,000 for five
projects.
- Minor G-19-05a Allocations (2.5f.(4)): $1,981,000 for two
projects.
There were no items of interest for this
highway pages in the June 2026 informational allocations.
2.5g Prop 1B Project Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
2.5p Local Transportation Climate Adaptation
Program (LTCAP) Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
2.5s Senate Bill 1 Programs Project Allocations
Local Partnership Program (LPP) Allocations
♠ (May) (5) Multi-Funded
Trade Corridor Enhancement Program (TCEP) and STIP (AB 608) –
Allocation Amendment. Request to amend the State-Administered
multi-funded TCEP and STIP Route 49, Corridor Improvements, La Barr-
McKnight, SB Truck Climbing Lane project, on the State Highway System,
in Nevada County, to deallocate $3,020,000 from the CON phase to reflect
project savings. (PPNO 4117)
♠ (May) (6) Multi-Funded TCEP
and Infrastructure for Rebuilding America (INFRA) – Allocation
Amendment. Request to amend the locally-administered multi-funded TCEP
and INFRA Otay Mesa East Port of Entry Technology Package project, on
Route 11 on the State Highway System, in San Diego County, to deallocate
$20,400,000 in TCEP funds from the CON phase due to local funds covering
the costs. (PPNO 0999J)
(Related Item under Ref. 2.5s.(9))
♠ (May) (7) Request for an
additional $15,000,000 (19.8 percent increase) in Construction Capital,
for the locally- administered TCEP Rice Avenue & Fifth Street Grade
Separation Project on Route 1 and Route 34, in Ventura County. (EA
31780, PPNO 4961)
(Related Item under Ref.: 2.8d.(5))
♠ (May) (8) Request for an
additional $100,000 (4.6 percent increase) in Pre-Construction Support,
Plans, Specifications, and Estimate (PS&E) phase, for the TCEP Fix 5
Cascade Gateway / I-5 Improvements Shasta project on I-5, in Shasta and
Tehama counties. (EA 0H920, PPNO 3597)
(Related Item under Ref. 2.8d.(4))
♠ (May) (9) TCEP –
Allocation Amendment. Request to amend the State-Administered TCEP Otay
Mesa East Land Port of Entry Early Work Package project, on Route 11 on
the State Highway System, in San Diego County, to deallocate $16,082,000
from the CON phase due to the project being awarded at a lower cost.
(PPNO 0999H)
(Related Item under Ref. 2.5s.(6))
♠ (May) (10) Request of
$6,292,000 for the State-Administered multi- funded TCEP and STIP Route 4 Wagon Trail Realignment Project (Eastern Segment), on the State
Highway System, in Calaveras County. (PPNO 3546)
♠ (Jun) (2) Request of
$15,000,000 for the locally-administered LPP (Competitive) Hazel
Avenue/US 50 Interchange – Segment 1 project, on the State Highway
System, in Sacramento County. (PPNO 6222)
♠ (Jun) (7) Request of
$33,570,000 for the locally-administered TCEP I-605/Valley Boulevard
Interchange Improvements Project, on the State Highway System, in Los
Angeles County. (PPNO 4382)
(Related Item under Ref. 2.2c.(2))
♠ (Jun) (8) Request for
$255,098,000 (38.7 percent increase) allocation in Construction Capital
for the locally- administered multi-funded CBI Program and TCEP East
Otay Mesa Land Port of Entry – Northbound Vehicle Processing and
Tolling Package (ATP #2) project on Route 11, in San Diego County. (EA
05641, PPNO 0999I)
(Related Item under Ref. 4.23)
♠ (Jun) (9) Request of
$30,879,000 for the locally-administered multi-funded STIP, ATP and LPP
(Formulaic) I-10/Monroe Street Interchange project, on the State
Highway System, in Riverside County. (PPNO 3017W)
♠ (Jun) (15) Request of
$60,076,000 for the State-Administered multi- funded LPP (Formulaic and
Competitive), and TCEP Route 156/Castroville Boulevard Interchange
project, on the State Highway System, in Monterey County. (PPNO
0057D)
(Related Items under Ref. 2.2c.(2), and 4.20)
♠ (Jun) (16) Request for an
additional $105,000 (4.2 percent increase) in Pre-Construction Support
for the PS&E phase, for the State-Administered multi-funded LPP
(Formulaic) and STIP Route 65 Realignment & Operational Improvements
(Oak St Roundabout), Location 1 Phase I project on State Route 65, in
Tulare County. Also impacts Route 198 and Route 245. (EA 43081, PPNO
0104A)
(Related Items under Ref. 2.2c.(1) and 4.20)
2.5t Traffic Congestion Relief Program (TCRP)
Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
2.5w Active Transportation Program (ATP)
Allocations
♠ (May) (3) Request of
$1,900,000 for the State-Administered ATP Route 49 Multimodal Corridor
Improvements, Nevada City project, on the State Highway System, in
Nevada County. (PPNO 6128A)
(Related Item under Ref.: 4.6)
♠ (Jun) (9) ATP –
Allocation Amendment. Request to amend the State-Administered ATP Route 49 Multimodal Corridor Improvements, Nevada City project, on the State
Highway System, in Nevada County, to split the RW Capital allocation
into RW Capital and RW Support. There is no change to the allocation
amount. (PPNO 6128A)
2.6g Transit and Intercity Rail Capital Program
(TIRCP) Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
4. TCIF and Aeronautic Program Updates / Policy
Matters
There were no items of interest for this agenda item in the reviewed
minutes.
Other Matters/Public Comment
There were no items of interest for this agenda item in the reviewed
minutes.
FREQUENTLY USED TERMS IN CTC MINUTES: California Transportation Commission (Commission or CTC),
California Department of Transportation (Department or Caltrans),
Regional Improvement Program (RIP), Interregional Improvement Program
(IIP), State Transportation Improvement
Program (STIP), State Highway Operation and Protection Program
(SHOPP), Traffic Congestion Relief Program (TCRP), Public
Transportation Account (PTA), Clean Air and Transportation Improvement
Act of 1990 (Proposition 116), High Speed
Passenger Train Bond Program (Proposition 1A), Highway Safety, Traffic
Reduction, Air Quality, and Port Security Bond Act of 2006
(Proposition 1B), Corridor Mobility Improvement Account (CMIA), State
Route 99 Bond Program (RTE or SR 99), Local
Bridge Seismic Retrofit Account (LBSRA), Trade Corridors Improvement
Fund (TCIF), Highway-Railroad Crossing Safety Account (HRCSA),
State-Local Partnership Program (SLPP), Traffic Light Synchronization
Program (TLSP), Letter of No Prejudice (LONP),
Environmental Phase (PA&ED), Design Phase (PS&E), Right of Way
(R/W), Fiscal Year (FY), Active Transportation Program (ATP),
Intercity Rail (ICR), California Aid to Airports Program (CAAP),
Acquisition & Development (A&D),
Transit and Inter-City Rail Capital Program (TIRCP), Transportation
Facilities Account (TFA), Trade Corridor Enhancement Program (TCEP),
Local Partnership Program (LPP), Local Streets and Roads Program
(LSRP), Solutions for Congested Corridors
Program (SCCP).
❦
March 2026:
Before we start on the update: 2026 marks the 30th Anniversary of this website. The changelog for 1996 shows the first "official" changes in October 1996, although it notes that "Changes before early 1996 were not specifically
noted, although this site, in various forms, dates back at least as far as
1992, and possibly as early as 1986. Searching on Google Groups uncovers an early posting of the state highway list in December of 1992 to the Usenet Group ca.driving. In 1995, there was a posting of the highway list in response to a question, showing a last modified date of 1994. By October 1996, postings were being made showing the existence of the California Highways
page off of Pacificnet.The earliest capture of the site on the Wayback
Machine is in December 1998." So welcome to the start of the 30th Anniversary year, or perhaps the 40th Anniversary year, of California
Highways!
This update covers January, February, and March 2026. Before we dive into
the updates to the California Highways site, an update on the California Highways: Route by Route podcast. As always, you can keep up with the show at the podcast's forever home at https://www.caroutebyroute.org , the show's page on Spotify for Podcasters, or you can subscribe through your favorite podcaster or via the RSS feeds (CARxR, Spotify for Podcasters). The following episodes have been posted since the last update at the end
of 2025:
- March | CA RxR 4.08: Route 12: Sonoma and Napa. Episode 4.08 is the first of three episodes focusing on Route 12. We start by exploring LRN 12, which we visited before in our episodes on Route 8, for LRN 12
became I-8 between San Diego and El Centro. We then look at Sign Route 12 and Route 12, which are mostly the same route… except, of
course, in the first segment where they differ in routing between Route 1 and US 101. Episode 4.08 focuses on the first two segments of Route 12, which covers the portions between Route 1 near Valley Ford or Jenner
through Sebastapol, Santa Rosa, Sonoma, Napa, and into Cordelia. Episode
4.09 will cover Route 12 from I-80 near Suisan City through the
Sacramento Wetlands to Lodi and Route 99. Lastly, Episode 4.10 will
cover Route 12 from Route 99 to the Sierra Foothill and San Andreas,
where it meets Route 49. As usual, we’ll cover historical
routings, projects, and names along the route. (Spotify for Creators)
- February | CA RxR 4.07: Route 11: From Pasadena to the Border. In Episode 4.07, we examine Route 11. We’ll start by exploring LRN 11, which
was essentially the first state highway, running from Sacramento to
Placerville, later extended to run from Antioch to the Nevada State Line
near Lake Tahoe. Today, it is primarily US 50 with a bit of Route 160.
We then explore the original Sign Route 11, which was LRN 165 and LRN 205, and is today’s Route 110. It was also US 60, and is perhaps
better known as the Harbor Freeway and the Pasadena Freeway / Arroyo
Seco Parkway. We explore the history and various routings of Sign Route 11, including the history of the Figueroa Tunnels. Lastly, we explore
the current Route 11, which is a short route near the Mexico border that
connects the San Diego Freeway System (Route 905/Route 125) to the Otay
Mesa East port of entry. (Spotify for Creators)
- January | CA RxR 4.06: I-10: San Bernardino Freeway. Episode 4.06 continues our exploration of Route 10. Episode 4.05 covered the first
segment of Route 10: The Santa Monica Freeway between Route 1 and the
I-5/US 101 junction. This episode, 4.06, covers the second segment of
Route 10, from US 101 to the Arizona Border. Along the way, we explore
the former I-110 segment, Route 10S, and do a deep dive into the US highways that shaped this segment of I-10: US 60, US 70, and US 99. We
explore the historical routing of those highways across this segment. We
also look at some of the names on the highway, and current projects
along the highway. (Spotify for Creators)
- January | CA RxR 4.05: I-10: Santa Monica Freeway. With Episode 4.05, we turn our attention to Route 10. This first episode on Route 10 starts
with an exploration of the 10th route (the last ordinal route
we’ll do), which was the Emigrant Gap Highway, and became the
basis for LRN 37. This became part of the Lincoln Highway, then US 40,
and is now part of I-80 from Sacramento to Nevada. We look at LRN 10,
which became Route 198 from US 101 near San Lucas to Sequoia National
Park. We then explore Sign Route 10 (which we discussed in our episode
on I-5 in Los Angeles county), which ran from US 101A to US 101, later
becoming Route 42 and US 101 Bypass, and eventually I-105 and I-5.
Lastly, we turn to post-1964 Route 10, which is today’s I-10. In
this episode, we focus on the first segment: “From Route 1 in
Santa Monica to Route 5 near Seventh Street in Los Angeles”, which
is today’s Santa Monica Freeway. We look at its origins as Sign
Route 6, which became Sign Route 26 along LRN 173, LRN 166, and LRN 171.
We focus on LRN 173 (LRN 166 and LRN 171 were discussed in our episode
on I-5 in Los Angeles county, as well as our episode on Route 6), which
was Olympic Blvd. We explore the history of the Santa Monica Freeway
segment, the experiments tried along this highway, some significant
projects along this segment, and some significant names on this segment.
(Spotify for Creators)
Turning to the updates to the California Highways pages: Updates were
made to the following highways, based on my reading of the (virtual)
papers and my research for the fourth and fifth seasons of the podcast in
January, February, and March 2026 (which are posted to the roadgeeking category at the "Observations Along The Road" and to the California Highways Facebook group) as well as any backed up email changes. I also reviewed the the AAroads forum (Ꜳ). This resulted in changes on the following routes, with credit as indicated [my research(ℱ), contributions
of information or leads (via direct mail or ꜲRoads)
from andy3175(2), ClassicsHasClass(3),
Tom Fearer [Max Rockatansky](4),
Mike Palmer(5), Will Poundstone(6)]: Route 1(ℱ),
Route 2(ℱ), Route 4(ℱ,4), I-5(ℱ),
Sign Route 7(ℱ), Route 9(4), I-10(ℱ),
Route 12(ℱ), Route 14(ℱ,6), Route 16(ℱ),
Route 24(ℱ), Route 26(ℱ), Route 28(ℱ),
Route 34(ℱ), Route 37(ℱ), Route 47(ℱ,5),
Route 49(ℱ), US 50(ℱ), Route 57(ℱ),
Campus Parkway/Route 59(4), Route 60(ℱ), Route 71(ℱ), Route 74(ℱ), I-80(ℱ),
Route 82(ℱ), Route 84(ℱ), Route 90(ℱ),
Route 91(ℱ), Route 92(ℱ), Route 93(ℱ),
Route 99(ℱ), US 101(ℱ), I-105(ℱ),
Route 118(ℱ), Route 125(2), Route 134(ℱ),
Route 138(ℱ), Route 140(ℱ), Route 168(ℱ),
Route 180(4), I-210(ℱ), I-215(ℱ),
Route 211(ℱ), I-215(ℱ), Route 217(ℱ),
Route 241(ℱ), Route 255(ℱ), Route 260(ℱ),
US 395(3), I-405(ℱ,6), I-580(ℱ),
I-680(ℱ), I-710(ℱ), I-880(ℱ),
LRN 7(ℱ), LRN 77(ℱ), LRN 221(ℱ),
County Sign Route E15(ℱ), El Camino Real(ℱ).
(Source: private email through 3/19/2026, Highway headline posts
through and including the March 2026 Headline post (up
to "Fifth Street" (HL) and "Douglas Flat" (GN)), AARoads through
3/27/2026)
Completed work on Season 4, and started work on Season 5, of the Route by
Route podcast. Research for and preparation of the episodes posted or
written during this period resulted in changes and updates to the
following routes: I-10, Route 12, Route 13, Route 14, Route 49, Route 110,
Route 112, Route 123, Route 260, I-980, LRN 8, LRN 9, LRN 10, LRN 11, LRN 12, LRN 13, LRN 14, LRN 24, County Sign Route J5.
Reviewed the Pending Legislation page, based on the California Legislature site, for bills through 2026-03-20. As usual, I recommend to every Californian
that they visit the legislative website regularly and see what their
legis-critters are doing. As many people are unfamiliar with how the
legislature operates (and why there are so many "non-substantive changes"
and "gut and amend" bills), I've added the legislative calendar (updated for 2026) to the end of the Pending Legislation page. This is early in the even-numbered year session, so
there's a lot of introduction of placeholder bills, and a lot of amending
of those placeholder bills (and bills that remained active from the
previous year). Noted the passage of the following bills / resolutions (I
also identified a number of errors in bills and resolutions, and submitted
comments as indicated):
- ACR 71 (Kalra) Little Saigon Freeway.
Designates the portion of US 101 in the County of Santa Clara from
Story Road (SCL 34.224) to the junction with Route 280 and Route 680
(SCL 34.873) as the “Little Saigon Freeway”. In
August 2025, it was noted that Santa Clara leaders had shown support
for the proposal; see here.
02/20/26 Chaptered by Secretary of State - Res.
Chapter 4, Statutes of 2026.
Reviewed the online agenda of the California Coastal Commission for the January through March meetings. The following items were of interest:
- February: Agenda Item W12a. February 2026 Appeal No.
A-1-MEN-25-0050 (Caltrans Gualala Downtown Streetscape Project,
Mendocino County). Appeals by (1) Save Gualala, and (2) Bower
Limited Partnership from decision of County of Mendocino granting permit
with conditions to the California Department of Transportation District
1 for the Gualala Downtown Streetscape Enhancement project that proposes
to reconfigure approximately 0.5 mi. segment of Route 1, removing
on-highway parking and installing two-way left turn lanes, bicycle
lanes, sidewalks, pedestrian refuge islands, crosswalks, activated
flashing beacons, drainage, landscaping, and other improvements from
post mile 0.6 to 1.0 in unincorporated Gualala, Mendocino County. (AS-A)
- February: Agenda Item W13a. February 2026 Application No.
1-25-0828 (Caltrans Albion River Bridge Repair and Maintenance,
Mendocino County). Application by the California Department
of Transportation District 1 to repair and maintain the Albion River
Bridge through replacement in-kind of 53 deteriorated timber scabs and
inspection and potential replacement of at least three split ring
connectors and one mole claw connector located at the base of the timber
towers, all located above the Albion River within the Caltrans right of
way on Route 1, Mendocino County. (MP-SF)
I checked California Transportation Commission page for the agenda and results of the January and March 2026 meetings of the California Transportation Commission. As always, note that I tend not to track items that do not impact these pages
— i.e., pavement rehabilitation or replacement, landscaping,
drainage, culverts, roadside facilities, charging stations, or other
things that do not impact the routing or history, unless they are really
significant. As such, the following items were of interest:
[ Note: ° indicates items that were
below the level of detail for updating the specific route pages; ♠ is an indicator used to keep
track of what has been added to the pages; ❧
indicates the results from the meeting, if the meeting minutes
were available. ]
2.1a. STIP/SHOPP Program/Project Amendments
♠ (Jan) (1) SHOPP Amendments
for Approval. Request to:
(Related Items under Ref. 2.5b.(1), 2.5b.(2), and 2.5d.(1))
- Add 25 new projects into the 2024 SHOPP. (2.1a.(1a) and 2.1a.(1b))
- Revise 13 projects currently programmed in the 2024 SHOPP.
(2.1a.(1d) and 2.1a.(1e))
Of these, the following projects/allocation
were at the level of interest for the highway pages (general, these are
significant new structures or changes, as opposed to repair or
rehabilitation in place; additions of bike paths, pedestrian, or
complete street elements; or non-visible changes). “⊘”
indicates phase not authorized.
- (1a) #1. 08-SBd-247 39.76/44.61. PPNO 08-3026N; ProjID 0825000079;
EA 1R520. Route 247 Near Lucerne Valley, from 0.2 mile north of Camp
Rock Road to 0.1 mile south of Oracle Road. Widen paved shoulders and
install traffic calming devices. Concurrent COS allocation under
Resolution FP-25-74; January 2026. Allocation ($ × $1000):
PA&ED $2,982; PS&E $2,745; R/W Sup $6,405; ⊘Con
Sup $2,527; ⊘R/W Cap
$3,245; ⊘Const Cap
$13,086; TOTAL $30,990. BC: 5/1/2030.
- (1a) #3. 01-Hum-36 26.5/26.8. PPNO 01-4900; ProjID 0124000155; EA
0M811. Route 36 Near Bridgeville, from 1.1 miles to 1.4 miles east of
Bridgeville Maintenance Station; also at 0.2 mile east of Deerfield
Ranch Road (PM 29.42). Realign roadway, install Rock Slope Protection
(RSP) to stabilize embankment, and repair pavement. Concurrent COS
allocation under Resolution FP-25-74; January 2026. Allocation ($
× $1000): PA&ED $1,424; PS&E $1,629; R/W Sup $204; ⊘Con Sup $1,759; ⊘R/W
Cap $96; ⊘Const Cap
$7,372; TOTAL $12,484. BC: 5/1/2029.
- (1a) #24. 03-Sac-16 4.165/12.74. PPNO 03-5992; ProjID 0316000146; EA
1H410. Route 16 In and near the cities of Sacramento and Rancho
Cordova, from South Watt Avenue to 0.2 mile east of Grant Line Road.
Relinquish roadway to County of Sacramento and City of Rancho Cordova.
Concurrent COS allocation under Resolution FP-25-74; January 2026.
Allocation ($ × $1000): PA&ED $1,340; PS&E $0; R/W Sup
$0; Con Sup $0; R/W Cap $10; Const Cap $0; TOTAL $1,350.
- (1d) #1 01-Lak-20
R43.9/R44.2 36.3/R44.2 .
PPNO 01-3217; ProjID 0122000135; EA 0M310. Route 20 Near Clearlake
Oaks, from 0.3 mile east 2.0 miles east of New Long
Valley Road to 0.6 mile east of Walker Ridge Road. Realign
curve, widen shoulders, construct stormwater treatment Best
Management Practices (BMPs), and construct rumble strips.
Note: Change postmile limits and project description to accommodate
additional stormwater treatment BMPs. Update right of way capital due
to additional acquisitions needed. Update performance measures to
reflect the new methodology. Amended Allocation ($ × 1,000):
PA&ED $1,592; PS&E $1,391; R/W Sup $391; Con Sup $1,684; R/W
Cap $46 $72; Const Cap $6,956; TOTAL $12,060
$12,086.
- (1d) #3. 01-Men-101 R9.5/10.8. PPNO 01-4763; ProjID 0121000072; EA
0L110. US 101 Near Hopland, from Hopland Overhead to Mountain House
Road. Widen shoulders and add left-turn lanes and a merge lane. Note:
Split onsite and offsite environmental mitigation into projects EA
0L111/PPNO 01-3247 and EA 0L112/PPNO 01-3259 from parent project EA
0L110/PPNO 01-4763. Amended Allocation ($ × $1000): PA&ED
$1,898; PS&E $1,394; R/W Sup $380; Con Sup
$3,786 $3,148;
R/W Cap $879 $46; Const Cap $20,750
$20,495; TOTAL $29,087 $27,361.
- (1e) #1. 05-SB-246 9.55/R20.9. PPNO 05-3010; ProjID 0519000122; EA
1M360. Route 246 In and near Lompoc and Buellton, from Route 1 to east
of Domingos Road. Replace San Ynez Bridge № 51-0128,
rehabilitate pavement and drainage systems, construct Class 1 bike and
pedestrian path, and upgrade facilities to Americans with Disabilities
Act (ADA) standards, guardrail and signs. (Additional contribution
from the Santa Barbara County Association of Governments (SBCAG).)
(Long
Lead Project). Concurrent COS allocation under Resolution
FP-25-74; January 2026. Note: Fully program previously unfunded
PS&E and R/W support phases. Due to long lead time in obtaining
right of way acquisition and utility relocations, preconstruction
engineering needs to begin to maintain delivery schedule. Amended
Allocation ($ × $1000): PA&ED $4,282; PS&E $0
$6,467; R/W Sup $0 $1,306; ⊘Con
Sup $10,248; ⊘R/W Cap
$5,849; ⊘Const Cap
$73,790; TOTAL $94,169 $101,942. “⊘” indicates phase
not authorized.
♠ (Mar) (1) SHOPP Amendments
for Approval:
(Related Item under Ref. 2.5b.(1))
- Add 23 new projects into the 2024 SHOPP. (2.1a.(1a))
- Revise 2 projects currently programmed in the 2024 SHOPP. (2.1a.(1d)
Of these, the following
projects/allocation were at the level of interest for the highway
pages (general, these are significant new structures or changes, as
opposed to repair or rehabilitation in place; additions of bike
paths, pedestrian, or complete street elements; or non-visible
changes). “⊘”
indicates phase not authorized.
- (1a) #8.
04-Sol-84
12.1. PPNO 04-2932R; ProjID 0426000148; EA 4X810. Route 84 Near
Five Points, at Miner Slough Bridge № 23-0035. This project
will repair damaged timber plank deck, extend corrugated steel
deck, and rehabilitate asphalt pavement. Note: On September 18,
2025, a routine bridge inspection identified deck failure occurred
on Spans 9 and 10 along the interface between the corrugated metal
deck and the timber deck, resulting in a through-deck hole. As an
immediate temporary measure, Field Maintenance has removed loose
pavement wearing surface around the hole and placed a steel plate
over the affected area. This project will repair damaged timber
plank deck, extend corrugated steel deck, and rehabilitate asphalt
pavement. As a long-term solution, programmed SHOPP project EA
0G660 will provide a full bridge replacement with a delivery year
in FY27/28. Allocation ($ × $1000): PA&ED $0; PS&E
$0; R/W Sup $15; Con Sup $474; R/W Cap $30; Const Cap $790; TOTAL
$1,309.
- (1d) #2. 03-Pla-80 17.2/R26.5. PPNO 03-5149; ProjID 0321000194;
EA 2J160. I-80 In and near Auburn, from 0.1 mile west of Nevada
Street Overcrossing to 0.3 mile east of Crother Road Overcrossing.
Rehabilitate roadway and drainage systems, construct truck
climbing lane and wildlife crossing, and upgrade signs, concrete
median barrier, guardrail, lighting, Traffic Management
System (TMS) elements, and facilities to Americans with
Disabilities Act (ADA) standards. Note: Update project description
to fully detail the scope of the project and facilitate
inter-agency consultation. These elements are not new scope and
were identified in the project initiation documents. The
unallocated phases will not carry over to the 2026 SHOPP. Amended
Allocation ($ × $1000): PA&ED $4,280; PS&E $4,620;
R/W Sup $1,260; Con Sup $5,820; R/W Cap $1,150; Const Cap $91,760;
TOTAL $108,890.
2.1b. STIP Program/Project Amendments/Approvals
for Notice
There were no items of interest for this agenda item in the reviewed
minutes.
2.2a. Submittal of Notice of Preparation for
Comments
There were no items of interest for this agenda item in the reviewed
minutes.
2.2b. Submittal of Notice of Documents Available
for Comment (DEIRs)
There were no items of interest for this agenda item in the reviewed
minutes.
2.2c. Approval of Projects for New Public Road
Connection / Future Consideration of Funding
♠ (Jan) (1) Approval of four
Projects for Future Consideration of Funding: (° indicates items
that were below the level of detail for updating the specific route
pages)
- 01-05-SB-246, PM 9.55/R20.90. Route 246 CAPM
and Robinson Bridge. Replace bridge and perform pavement
preservation and culvert rehabilitation on State Route 246 from Post
Miles 9.55 to R20.90 in Santa Barbara County. (MND) (PPNO 3010)
(SHOPP)
(Related Item under Ref.: 2.5b.(2))
- 02-05-SB-246, PM 30.173/30.435. Alamo Pintado
Bridge Replacement. Replace the Alamo Pintado Bridge (Bridge
№ 51-0130), improve connectivity to the existing bike path, and
upgrade existing outdated Americans with Disabilities Act curb ramps
on State Route 246 from PM 30.173 to 30.435 in Santa Barbara County.
(MND) (PPNO 3013) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
- 03-07-LA-110, PM R25.34/30.1. SR-110 Bridge
Replacement & Railing Upgrade Project. Replace NB Route 110
to NB I-5 Connector Sidehill Viaduct (Bridge № 53-2225G),
upgrade the bridge railing of Avenue 43 Ramp Bridge (Bridge №
53-0985S) and Arroyo Seco Channel Bridge (Bridge № 53-0276).
(ND) (PPNO 5701) (SHOPP)
- °04-08-SBd-18, PM 95.4; 08-SBd-15, PM 43.8. State
Route 18 Bridge Deck Overlay Project. Repair the Mojave River
Bridge Overcrossing (Bridge № 54-0307) as part of the SHOPP
Bridge Preventative Maintenance Program. Conduct bridge deck overlay,
upgrade bridge rail, replace approach conforms and joint seals,
upgrade approach guardrails, replace median barrier, remove bat boxes,
replace sidewalk on State Route 18 Mojave River Bridge (Bridge №
54-0307) and install exclusionary devices and bat panels under I-15
Mojave River Bridge (Bridge № 54-0483) in San Bernardino County,
California. (MND) (PPNO 3017G) (SHOPP)
(Related Item under Ref.: 2.5b.(2))
♠ (Jan) (2) Approval of two
Projects for Future Consideration of Funding: (° indicates items
that were below the level of detail for updating the specific route
pages)
- °01-04-Mrn-101, PM 8.47. U.S. 101 Corte
Madera Creek Bridge Rehabilitation Project. Rehabilitate the
existing on-ramps from Sir Francis Drake Boulevard onto the southbound
lane of US 101 at Corte Madera Creek Bridge (Bridge № 27-008K)
and improve the bridge deck, a bridge abutment, and the bridge support
columns. (ND Addendum) (PPNO 2906F) (SHOPP)
- 02-12-Ora-91, PM 6.4/R9.1; 12-Ora-55, PM
17.5/R17.7. State Route 91 (SR-91) Improvement Project Segment 2.
Implement temporary relocation of a bat colony from the Route 91 Santa
Ana River Bridge (Bridge № 55-0106) to the City of Anaheim Santa
Ana River Sub-Channel Bridge (Bridge № 55-C0111), to accommodate
widening of the Santa Ana River Bridge, reconstruct and upgrade the
westbound Route 91 Kraemer Boulevard off-ramp, realign the Route 91
eastbound Tustin Avenue on-ramp and off-ramp, partially reconstruct
the Route 91 westbound Tustin Avenue on-ramp and off-ramp, modify a
drainage outlet on the west side of the Carbon Canyon Diversion
Channel, construct an opaque masonry block wall on East Frontera
Street, and construct new and replacement retaining and sound walls at
various locations. (MND Addendum) (PPNO 4570C) (STIP) (LPP
(Formulaic))
♠ (Jan) (5) Approval of
Project for Future Consideration of Funding: 07-Los Angeles County. Link
Union Station. Elevate tracks, expand passageway, provide new
viaduct structure connecting 8 new run-through tracks over US 101.
(Addendum and Supplemental EIR) (TIRCP) (STIP) (PPNO CP033 and PPNO
9882)
(Related Items under Ref.: 2.6a.(2) and 2.6g.(1))
♠ (Mar) (1) Approval of Four
Projects for Future Consideration of Funding: (° indicates items
that were below the level of detail for updating the specific route
pages)
- 01-01-Lak-29, PM 5.0/5.9. Middletown Safety
South Project. Improve Safety on State Route 29 in Lake County,
from Post Miles 5.0 to 5.9 through the city of Middletown, including
shoulder widening to accommodate standard shoulder widths (8 feet
width), left turn channelization, two-way left turn lane, new and
modified curb ramps, bulb outs, approximately 1,200 feet of new
sidewalk, lighting, installation of two pedestrian-activated
rectangular rapid flashing beacons, extending two existing culverts to
maintain drainage, replacement of one culvert and repair to one
drainage inlet. (ND) (PPNO 3208) (SHOPP)
(Related Item under Ref. 2.5b.(2))
- 02-03-Nev-49, PM 2.10/9.80. Grass Valley
Wildfire Evacuation Route Project. Widen the existing shoulders
and provide a two-way left turn lane to enhance traffic flow during
emergency events on the State Route 49 corridor between Wolf
Road/Combie Road at Post Mile 2.10 to Ponderosa Pines and Post Mile
9.80 south of Grass Valley. (MND) (PPNO 4143) (SHOPP) (LTCAP)
(Related Items under Ref. 2.5b.(2) and 2.5p.(1))
- 03-04-Son-116, PM 21.6/R22.6. State Route (SR)
116 Green Valley Road Safety Improvements Project. Improve
safety at the intersection of State Route 116 and Green Valley Road,
in Sonoma County. Specifically, construct a 130-foot-diameter
roundabout at the existing intersection to reduce the potential and
severity of collisions at the intersection. (ND) (PPNO 2029L) (SHOPP)
(Related Item under Ref. 2.5b.(2))
- °04-05-Mon-1, PM 27.76/70.87. Big Creek
to Carmel Drainage Restoration. Replace or rehabilitate
drainage culverts on State Route 1 from Post Miles 27.76 to 70.87 in
Monterey County. (MND) (EA 1N360) (SHOPP Minor A)
♠ (Mar) (3) Approval of
Project for Future Consideration of Funding: 04-CC-680, PM R10.7/23.1. Interstate 680 Northbound Express Lane Completion Project. Modify Northbound
(NB) I-680 from Livorna Road to South of the Benicia-Martinez Bridge
Toll Plaza (Post Mile R10.7 to 23.1) in Contra Costa County, California.
Specifically, reduce the NB express lane gap by constructing a NB
express lane from Livorna Road to south of the Route 24 Interchange
(adding capacity to NB I-680), as well as converting the existing NB
High-Occupancy Vehicle lane to an express lane from Route 242 to north
of Arthur road, and construction of braided ramps for the Lawrence Way
on- ramp. (FEIR) (PPNO 2321B) (STIP) (LPP (Formulaic))
2.3a. Route Adoptions
There were no items of interest for this agenda item in the reviewed
minutes.
2.3b. New Public Road Connection
There were no items of interest for this agenda item in the reviewed
minutes.
2.3c. Relinquishments
♠ (Mar) Two Relinquishment
Resolutions:
- 08-SBd-83-PM 0.197/6.410. Right of way along State Route 83 between
State Route 71 and Riverside Drive, in the city of Chino.
(Related item under Ref. 2.5b.(1))
- 11-SD-5-PM 12.9/13.2. Right of way along I-5 bounded by Boston
Avenue, 29th Street, and 32nd Street, in the
city of San Diego.
2.3d. Vacations
There were no items of interest for this agenda item in the reviewed
minutes.
2.5a Minor Projects
♠ (Jan) Request $1,239,000
for one District Minor project:
- #1. $1,239,000. 06-Mad-99 R7.4/R7.7. ProjID 0622000002; EA 1E230.
Route 99 Near Madera, on County Road 29 from 0.1 mile North of Avenue
12 to 0.4 mile south of Pecan Lane. Operational improvements for
eventual relinquishment. This project will be funded from the
District's Minor Program.
2.5b. Financial Allocations for SHOPP Projects /
Federal Discretionary Grant Funds
♠ (Jan) (2) Request of
$120,298,000 for 75 2024 SHOPP preconstruction project phases for
environmental support, design, and RW support.
(Related Items under Ref.: 2.1a.(1), 2.2c.(1), and 2.5b.(1))
Of these, the following were of interest for
the highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- (2a) #1. $1,424,000. 01-Hum-36 26.5/26.8. PPNO 01-4900; ProjID
0124000155; EA 0M811. Route 36 Near Bridgeville, from 1.1 miles to 1.4
miles east of Bridgeville Maintenance Station; also at 0.2 miles east
of Deerfield Ranch Road (PM 29.42). Realign roadway, install Rock
Slope Protection (RSP) to stabilize embankment, and repair pavement.
Concurrent Amendment under SHOPP Amendment 24H-017; January 2026.
Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): PA&ED $1,424.
- (2a) #3. $1,731,000. 01-Lak-20 36.3/R44.2. PPNO 01-3217; ProjID
0122000135; EA 0M310. Route 20 Near Clearlake Oaks, from 2.0 miles
east of New Long Valley Road to 0.6 mile east of Walker Ridge Road.
Realign curve, widen shoulders, construct stormwater treatment Best
Management Practices (BMPs), and construct rumble strips. CEQA - CE,
12/19/2025. Concurrent Amendment under SHOPP Amendment 24H-017;
January 2026. Pre-Construction Phase Allocation ($ × $1000):
Budgeted (Actual, if different): PS&E $1,391; RW
Sup $391 ($340).
- (2a) #7. $1,340,000. 03-Sac-16 4.165/12.74. PPNO 03-5992; ProjID
0316000146; EA 1H410. Route 16 In and near the cities of Sacramento
and Rancho Cordova, from South Watt Avenue to 0.2 mile east of Grant
Line Road. Relinquish roadway to County of Sacramento and City of
Rancho Cordova. Concurrent Amendment under SHOPP Amendment 24H-017;
January 2026. Pre-Construction Phase Allocation ($ × $1000):
Budgeted (Actual, if different): PA&ED $1,340.
- (2a) #12. $4,739,000. 05-SB-101 30.1/R48.8. PPNO 05-3072; ProjID
0521000172; EA 1P130. US 101 Near Santa Barbara, from Dos Pueblos
Creek Undercrossing to Route 1. Rehabilitate pavement, replace sign
panels, upgrade guardrail, and improve wildlife crossing. Includes
federal Wildlife Crossings Pilot Program (WCPP) Grant amount of
$8,000,000. CEQA - CE, 11/18/2025. Pre-Construction Phase Allocation
($ × $1000): Budgeted (Actual, if different):
PS&E $4,339; RW Sup $375 ($400)
- (2a) #26. $2,982,000. 08-SBd-247 39.76/44.61. PPNO 08-3026N; ProjID
0825000079; EA 1R520. Route 247 Near Lucerne Valley, from 0.2 mile
north of Camp Rock Road to 0.1 mile south of Oracle Road. Widen paved
shoulders and install traffic calming devices. Concurrent Amendment
under SHOPP Amendment 24H-017; January 2026. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PA&ED $2,982.
- (2b) #9. $4,748,000. 05-SB-246 30.3/31.4. PPNO 05-3013; ProjID
0519000148; EA 1M420. Route 246 In and near Solvang, from Alamo
Pintado Road to Entrance Road. Replace bridge, construct Class 1 bike
and pedestrian paths, and upgrade facilities to Americans with
Disabilities Act (ADA) standards. (Additional $1,204,000 contribution
from the city of Solvang.) CEQA - MND, 10/20/2025. Future
consideration of funding approved under Resolution E-26-02; January
2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): PS&E $4,115 ($4,232);
RW Sup $516.
♠ (Mar) (1) Request
$28,745,000 for four SHOPP projects.
(Related Items under Ref. 2.1a.(1) and 2.3c.)
Of these, the following were of interest for
the highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- (1) #3. $18,824,000. 08-SBd-83 R0.197/6.41. PPNO 08-3015C; ProjID
0819000156; EA 1L100. Route 83 In and near Chino, from 0.2 mile north
of Route 71 to Riverside Drive. Financial Contribution Only (FCO) to
City of Chino to relinquish roadway. CEQA - CE, 01/23/2025 NEPA - CE,
01/23/2025. Pre-Construction Allocations Budgeted (Actual):
PA&ED $1,530,000 ($1,513,741); PS&E
$1,150,000 ($639,456); RW Sup $50,000 ($29,265).
Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): CONST $15,885 ($18,824).
♠ (Mar) (2) Request of
$84,538,000 for 83 2024 and 2026 SHOPP preconstruction project phases
for environmental support, design, and R/W support.
(Related Items under Ref. 2.2c.(1), 2.2c.(4), 2.5b.(4), 2.5p.(1),
4.7, and 4.13)
Of these, the following were of interest for
the highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- (2a) #1. $3,230,000. 01-Lak-29 5.0/5.9. PPNO 01-3208; ProjID
0122000027; EA 0L590. Route 29 Near Middletown, from 0.1 mile south of
Central Park Road to 0.1 mile north of Young Street. Widen shoulders,
construct left-turn lanes and two-way left turn lanes, install
lighting, pedestrian activated flashing beacons, overlay pavement, and
construct curb ramps and sidewalk. Concurrent consideration of funding
under Resolution E-26-11; March 2026. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PS&E $2,486; RW Sup $1,485 ($744).
- (2a) #5. $1,370,000. 03-Nev-20 R17.2/R17.8. PPNO 03-4010; ProjID
0325000147; EA 1N900. Route 20 In Nevada City, at the intersection
with Route 49/Uren Street. Construct roundabout. Concurrent Amendment
under SHOPP Amendment 26H-000; March 2026. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PA&ED $1,370.
- (2a) #6. $2,400,000. 03-Nev-49 2.1/9.8. PPNO 03-4143; ProjID
0323000087; EA 4J110. Route 49 Near Grass Valley, from Wolf
Road/Combie Road to Ponderosa Pines Road. Widen shoulders, construct
two-way left-turn lane, rehabilitate pavement and drainage systems,
and upgrade lighting, signs, guardrail, Traffic Management System
(TMS) elements, and add wildlife crossing. (Additional contribution of
$35,000,000 from Nevada County Transportation Commission in Local
Transportation Climate Adaptation Program funds.) Concurrent
consideration of funding under Resolution E-26-12; March 2026. Related
allocation for non-SHOPP project PPNO 03-4143 under Resolution
LTCAP-A-2526-07; March 2026. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PS&E $2,200; RW Sup $200.
- (2a) #13. $2,449,000. 04-Son-116 21.6/R22.6. PPNO 04-2029L; ProjID
0419000234; EA 3Q640. Route 116 Near Sebastopol, at the intersection
with Green Valley Road. Construct intersection improvements.
Concurrent consideration of funding under Resolution E-26-13; March
2026. Nine month allocation time extension for PS&E and R/W Sup
approved under Waiver 25-95; June 2025. Pre-Construction Phase
Allocation ($ × $1000): Budgeted (Actual, if different):
PS&E $1,739; RW Sup $598 ($710).
- (2a) #19. $1,842,000. 08-Riv-15 40.3/41.3. PPNO 08-3023M; ProjID
0824000139; EA 1P790. I-15 In and near Corona, from Magnolia Avenue to
Route 91 connector ramps. Construct auxiliary lane in the northbound
direction. CEQA - CE, 12/17/2025. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PS&E $1,639 ($1,748); RW Sup $81 ($94).
- (2a) #22. $225,000. 10-Mer-140 16.0/16.5. PPNO 10-3438; ProjID
1017000175; EA 1H020. Route 140 Near Hilmar, at the intersection of
Route 140 (PM 16.0/16.5) and Route 165 (PM 26.6/27.1). Construct
roundabout. CEQA - CE, 10/15/2025. Pre-Construction Phase Allocation
($ × $1000): Budgeted (Actual, if different):
PS&E $200; RW Sup $25.
- (2a) #23. $650,000. 10-SJ-120 11.3/11.8. PPNO 10-3477; ProjID
1019000084; EA 1K460. Route 120 Near Manteca, at French Camp Road.
Construct signalized intersection. Concurrent Amendment under SHOPP
Amendment 26H-000; March 2026. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PS&E $500; RW Sup $150.
- (2b) #4. $4,184,000. 03-Yub-70 14.8/15.7. PPNO 03-9820; ProjID
0315000082; EA 0H160. Route 70 In and near Marysville, from south of
14th Street to north of Cemetery Road. Roadway
rehabilitation and operational improvements including turn pockets and
auxiliary lanes. This is a Construction Manager/General Contractor
(CMGC) project. Future consideration of funding approved under
Resolution E-25-43; May 2025. Concurrent R/W Cap allocation under
Resolution FP-25-84; March 2026. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PS&E $3,000; RW Sup $1,184.
- (2b) #18. $250,000. 10-Mer-59 R0.0/12.1. PPNO 10-3439; ProjID
1018000284; EA 0V690. Route 59 Near Merced, from Route 152 to Reilly
Road. Rehabilitate pavement, upgrade guardrail and lighting, replace
sign panels, construct rumble strips, rehabilitate drainage, replace
one bridge, and rehabilitate two bridge decks. Future consideration of
funding approved under Resolution E-22-68; August 2022.
Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): PS&E $200; RW Sup $50.
♠ (Mar) (3) Request of
$107,421,000 for 38 2026 SHOPP preconstruction project phases for
environmental support. Note that the CTC
didn't make this one easy, just giving a table with PPNOs, ProjIDs,
EAs, and allocations. No route numbers, so I had to search the 2026
draft SHOPP.
(Related Item under Ref. 4.7)
Of these, the following were of interest for
the highway pages: (Uninteresting projects included environmental
mitigation, drainage and culvert improvements, pavement rehabilitation,
pedestrian and bike lane improvements, repairs and improvements to
Caltrans buildings and labs, trash and water discharge capture, signage
and guardrail repairs, and so forth)
- (3) #7. $900,000. 03-Yolo-16 39.407/39.66. PPNO 03-8673; ProjID
0323000217; EA 4J630. Route 16 Near Woodland, at intersection with
County Road 97. Construct roundabout, upgrade lighting, rehabilitate
pavement and drainage systems, install Closed-Circuit Television
(CCTV) and advanced warning signs with beacon, and construct new curb
ramps and driveway. Pre-Construction Phase Allocation ($ ×
$1000): Budgeted (Actual, if different): PA&ED
$900.
- (3) #20. $4,920,000. 08-SBD-15 173.7L/174.2L. PPNO 08-3021Y; ProjID
0824000015; EA 1P430. I-15 Near Wheaton Springs, at Wheaton Wash
Bridge № 54-0621L (PM 173.84L). Replace bridge. Pre-Construction
Phase Allocation ($ × $1000): Budgeted (Actual, if
different): PA&ED $4,920.
- (3) #24. $2,797,000. 09-Iny-190 96.8 /111.6. PPNO 09-2722; ProjID
0921000045; EA 39040. Route 190 Near Furnace Creek, from 3.6 miles
east of Scotty's Castle Road to 0.1 mile west of Badwater Road.
Rehabilitate pavement and drainage systems, construct
two-way-left-turnlane with paved shoulders, and upgrade Transportation
Management System (TMS) elements. Note: Complex and lengthy
environmental consultation and permitting is needed due to Death
Valley National Park location. Pre-Construction Phase Allocation ($
× $1000): Budgeted (Actual, if different):
PA&ED $2,797.
♠ (Mar) (4) Request an
allocation of $10,500,000 for the Right of Way Capital phase for the
SHOPP Roadway Rehabilitation project, on State Route 70, in Yuba County,
programmed in Fiscal Year 2026-27. (PPNO 9820)
(Related Items under Ref. 2.5b.(2) and 2.5b.(4))
- #1. $10,500,000. 03-Yub-70 14.8/15.7. PPNO 03-9820; ProjID
0315000082; EA 0H160. Route 70 In and near Marysville, from south of
14th Street to north of Cemetery Road. Outcome/Outputs: Roadway
rehabilitation and operational improvements including turn pockets and
auxiliary lanes. This is a Construction Manager/General Contractor
(CMGC) project. CEQA - EIR, 02/04/2025. NEPA - FONSI, 12/07/2020.
Future consideration of funding approved under Resolution E-25-43; May
2025. Concurrent COS allocation under Resolution FP-25-83; March 2026.
Pre-Construction Expenditures: Budgeted (Expended):
PA&ED $3,500,000 ($3,425,582); PS&E
$3,000,000 ($0); RW Sup $1,184,000 ($0).
Construction Phase Allocation ($ × $1000): Budgeted (Actual,
if different): RW Cap $20,800 ($10,500).
2.5c Financial Allocations for STIP Projects
♠ (Jan) (2) Request of
$72,889,000 for the locally-administered STIP I-10 Corridor Freight and
Managed Lane Project: Sierra Ave to Pepper Ave, Contract 2B, on the
State Highway System, in San Bernardino County. (PPNO 1326)
2.5d Allocations for Projects with Costs that
Exceed 20 Percent of the Programmed Amount
♠ (Jan) (1) Request for
$49,313,000 (105.6 percent increase) allocation in Construction Capital
and $6,300,000 (43.2 percent increase) allocation in Construction
Support, for the SHOPP Pavement Preservation project on State Route 1,
in Los Angeles County.(EA 35420, PPNO 5491)
(Related Item under Ref.: 2.1a.(1))
2.5e Supplemental Fund Allocations
♠ (Mar) (3) Request for an
additional $1,600,000 (23.6 percent increase) in Construction Support
for the SHOPP Bridge Rehabilitation and Replacement project on State
Route 217, in Santa Barbara County. (EA 1C360, PPNO 2386)
♠ (Mar) (6) Request for an
additional $375,000 (4.6 percent increase) in Construction Capital, for
the SHOPP Americans with Disabilities Act Curb Ramps project on State
Route 164, in Los Angeles County. (EA 32080, PPNO 4982)
2.5f Financial Allocations for SHOPP
♠ (Jan) Informational Reports
on Allocations Under Delegated Authority
- Emergency G-11 Allocations (2.5f.(1)): $89,724,000 for 28 projects.
- SHOPP Safety Sub-Allocations (2.5f.(3)): $14,495,000 for three
projects.
- Minor G-19-05a Allocation (2.5f.(4)): $1,828,000 for two projects.
The following projects were of interest for
the highway pages. Uninteresting projects included emergency storm
damage mitigation that was primarily repairs; repairing damage from
unhoused individuals; and damage from accidents, because all of these
eventually restore the facility to the condition it was in before the
emergency (and thus there is no new facility or significant change to
the facility).
- (1) #21. $3,350,000. 07-LA-10 14.5/17.4. PPNO 07-6147; ProjID
0724000159; EA 2XL30. In the city of Los Angeles, from Washington
Boulevard to Olympic Boulevard; also on Route 5 at Sheldon Street (PM
35.83/35.98). On November 11, 2023, a large fire broke out in the
vicinity of 14th Street and Lawrence Street, engulfing
Route 10 in fire because of flammable materials stored under the
freeway. A different tenant is storing similar material at multiple
sites, has breached their lease terms, and is noncompliant, posing a
similar risk of fire. This project will secure the site and replace
fencing with hardened fence and gates. Abatement is being sought from
the responsible party. During the initial site cleanup, various
people, companies and/or entities refused to vacate the damage area
delaying cleanup. Furthermore, a court order decision allowed
occupants to be provided reasonable time to vacate the area, further
delaying the length of the project. The first supplemental required
additional CON Sup due to additional working days required to
administer and complete the project. As the work progressed, enhanced
security measures were undertaken to protect construction crews from
criminal activity during extended hours and night shifts. EarthCam
monitoring equipment was installed for 24- hour surveillance as well
as additional security staff on site to prevent arson or vandalism.
However, the Sheldon Yard property was vandalized rendering it
uninhabitable and requiring significant rehabilitation. This
supplemental will fund the additional security measures for
construction crews and rehabilitate the vandalized state property.
Breakdown: CON ENG $250,000; CONST $3,100,000.
- (3) #2. $9,394,000. 06-Ker-43 15.6/16.0. PPNO 06-7044; ProjID
0620000038; EA 1A470. Route 43 In Shafter, at the intersection with
Santa Fe Way and Los Angeles Street. Construct roundabout. This
project will improve safety and reduce the number and severity of
collisions. (Additional CMAQ funds of $250,000 contribution for
PA&ED and $1,250,000 for PS&E from the City of Shafter, and
Right of Way acquisition by the City of Shafter for $1,500,000). CEQA
- MND, 07/26/2022; Re-validation 07/14/2025. NEPA - CE, 07/26/2022;
Re-validation 07/14/2025. Future consideration of funding approved
under Resolution E-22-96; December 2022. Twenty month allocation time
extension for CONST and CON ENG approved under Waiver 24-125; August
2024. Allocation Date: 12/22/25. Breakdown: CON ENG $1,900,000; CONST
$6,065,000.
♠ (Mar) Informational Reports
on Allocations Under Delegated Authority
- Emergency G-11 Allocations (2.5f.(1)): $148,410,000 for 31 projects.
- SHOPP Safety Sub-Allocations (2.5f.(3)): $11,375,000 for three
projects.
- Minor G-19-05a Allocations (2.5f.(4)): $4,166,000 for four projects.
The following projects were of interest for
the highway pages. Uninteresting projects included emergency storm
damage mitigation that was primarily repairs; repairing damage from
unhoused individuals; and damage from accidents, because all of these
eventually restore the facility to the condition it was in before the
emergency (and thus there is no new facility or significant change to
the facility).
- (1) #10. $12,560,000. 04-SF-280 R6.61/T7.2. PPNO 04-2930Q; ProjID
0426000005; EA 4X140. I-280 In the City and County of San Francisco,
at China Basin Viaduct Bridge № 34-0100. During June 2025
construction activities on Highway Maintenance Program project EA
1W140, which includes scope for end diaphragm repairs, the contractor
observed a crack in the precast girder. A site inspection with partial
removal of diaphragm concrete identified a full-depth cracked girder
at Bent A20 and concerns of bearing quality of Girders 14 through 17
at Bent A17 and Girder 16 at Bent A20. The cause of damage remains
under investigation. Permit loads have been restricted on the bridge
until repairs can be made. This project will repair bridge girders and
place 3 temporary shoring bents. This supplemental is necessary to
fund additional bridge girder repair. Subsequent to the initial
director's order, the Caltrans team determined that the ends of the
girders in all spans should be exposed and evaluated to assess their
condition. Based on this evaluation, the Caltrans team found that
nearly 114 of girder ends across all spans had deteriorated and
required retrofit. This project will repair additional bridge girders.
Construction funds allocated: (1) Initial G-11 Allocation 07/30/2025:
$8,640,000; (2) Supplemental G-11 Allocation 01/30/2026: $12,560,000;
(3) Revised Allocation: $21,200,000; (4) Additional supplemental funds
allocated: R/W Cap: $960,000. Breakdown: CON ENG $1,530,000; CONST
$11,030,000.
- (1) #18. $5,750,000. 07-LA-2 79.2/82.2. PPNO 07-6475; ProjID
0726000158; EA 2XW50. Route 2 In and near Wrightwood, from 0.7 mile
west of Big Pines Highway to San Bernardino County line. Also, in San
Bernardino County on Route 2, from Los Angeles County line to Spruce
Street. Heavy winter rains in December 2025 resulted in excessive
runoff that eroded shoulder, roadway and embankment slopes.
Maintenance forces implemented traffic control, including partial
closures of the shoulder and roadway, to protect the traveling public.
A required Geotechnical assessment is being conducted to determine the
slope repair strategy which may result in an additional supplemental
request. This project will reconstruct roadway and stabilize slopes.
Construction funds allocated: (1) Initial G-11 Allocation 01/22/2026:
$5,750,000; (2) Additional funds allocated: PS&E: $150,000; R/W
Sup: $100,000; R/W Cap: $100,000. Breakdown: CON ENG $750,000; CONST
$5,000,000.
- (1) #28. $18,400,000. 08-SBd-38 14.9/44.2. PPNO 08-3026Z; ProjID
0826000040; EA 1T330. Route 38 Near Angelus Oaks and Erwin Lake, from
0.1 mile west of Forest Home Boulevard to Lakewood Drive. On September
18, 2025, a series of intense storms caused washouts, flooding, debris
flow, and full road closure within the El Dorado Fire burn scar. A
segment of Route 38 experienced a complete roadway washout. This
project will remove debris and hazardous trees, clean drainage basins,
reconstruct roadway, repair drainage systems, guardrail, embankments,
debris barriers, roadway signs, and cable railings, stabilize slopes,
and provide slope scaling operations and traffic control. This
supplemental is necessary because debris removal and infrastructure
damage has exceeded original estimates, to the extent that debris flow
depths exceeded 40 feet, clogged the drainage system, overtopped the
highway, and altered the creek's historic flow path. This project will
provide additional repair including work to restore embankment with
rock buttress walls, construct new drainage systems, redirect runoff
flow paths, and increase working levels to a seven-day multiple shift
per day work week to reopen the road as originally scheduled.
Construction funds allocated: (1) Initial G-11 Allocation 10/07/2025:
$12,900,000. (2) Supplemental G-11 Allocation 01/07/2026: $18,400,000.
(3) Revised Allocation: $31,300,000. (4) Additional supplemental funds
allocated: R/W Sup: $100,000; R/W Cap: $200,000. Breakdown: CON ENG
$1,600,000; CONST $16,800,000 .
- (3) #2. $4,852,000. 03-Sac-12 3.5/3.8. PPNO 03-5964; ProjID
0322000248; EA 3J310. Route 12 Near Rio Vista, at the intersection
with Jackson Slough Road. Install traffic signal. This project will
improve safety and reduce the number and severity of collisions.
Initial expenditures - budgeted (expended): PA&ED
$1,124,000 ($1,024,341); PS&E $800,000 ($741,228);
R/W Sup $140,000 ($49,061). CEQA - CE, 09/05/2024;
Re-validation 12/18/2025. NEPA - CE, 09/05/2024; Re-validation
12/18/2025. Allocation Date: 01/14/26. Breakdown: CON ENG $990,000;
CONST $3,600,000.
2.5g Prop 1B Project Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
2.5p Local Transportation Climate Adaptation
Program (LTCAP) Allocations
♠ (Mar) (1) Request of
$8,266,000 for the State-Administered LTCAP Route 49 Grass Valley
Wildfire Evacuation Route project, on the State Highway System, in
Nevada County. (PPNO 4143)
(Related Items under Ref. 2.2c.(1) and 2.5b.(2))
2.5s Senate Bill 1 Programs Project Allocations
Local Partnership Program (LPP) Allocations
♠ (Jan) (5) Multi-funded
Solutions for Congested Corridors (SCCP) and Local Partnership Program
(LPP) (Formulaic) – Allocation Amendment. Request to amend the
locally-administered multi-funded SCCP and LPP (Formulaic) Mid County
Parkway: Ramona Expressway project, off the State Highway System, in
Riverside County, to allow non-proportional spending. There is no change
to the allocation amount. (PPNO 1276). Note:
The Mid-County Parkway is discussed on the page for Route 74.
♠ (Jan) (6) Request of
$96,117,000 for the State-Administered multi-funded SCCP, LPP (Formulaic
and Competitive) and STIP Santa Barbara US 101 Multimodal Corridor
Project – Segment 4E North – Cabrillo Interchange, on the
State Highway System, in Santa Barbara County. (PPNO 7101H)
(Related Item under Ref.: 4.10)
♠ (Mar) (2) Request of
$1,990,000 for the locally-administered LPP (Formulaic) Route 99/Route 120 Connector Project Phase 1B, on the State Highway System, in San
Joaquin County. (PPNO 3162B)
2.5t Traffic Congestion Relief Program (TCRP)
Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
2.5w Active Transportation Program (ATP)
Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
2.6g Transit and Intercity Rail Capital Program
(TIRCP) Allocations
There were no items of interest for this agenda item in the reviewed
minutes.
4. TCIF and Aeronautic Program Updates / Policy
Matters
♠ (Mar) 4.3 Presentation of
the 2026 State Transportation Improvement Program Staff Recommendations
(Related Item under Ref. 4.4)
♠ (Mar) 4.4 Adoption of the
2026 State Transportation Improvement Program
(Related Item under Ref. 4.3)
Note: This resulted in updates to the
following routes (search for "2026 STIP"): Route 1, Route 4, I-5, I-10,
Route 12, Route 14, I-15, Route 18, Route 29, Route 37, Route 41, Route 46, Route 49, US 50, Route 51/Business Route 80, Route 57, Route 58, Route 65, Route 66/County Sign Route 66, Route 67, Route 68, Route 74, I-80, Route 85, Route 89, Route 91, Route 92, Route 94, Route 96, Route 99, US 101, Route 116, Route 121, Route 132, Route 135, Route 138, Route 156, Route 198, I-205, Route 227, Route 255, Route 260, I-280, Route 299, I-680, I-805, I-880
♠ (Mar) 4.7 Adoption of the
Final 2026 State Highway Operation and Protection Program (SHOPP)
(Related Items under Ref. 2.5b.(2), 2.5b.(3), and 2.5b.(4))
Note: Reviewed the draft SHOPP that was
submitted to the meeting for projects of interest, using the same
criteria used for CTC Agenda Item 2.5b: That is, looking for projects
that have a longer-term impact for the highway pages: realignment of a
highway, addition of lanes (auxiliary, HOV, HOT), significant widening,
new wildlife crossings, roundabouts, replacement of bridges. Items that
are repairs in place (resurfacing, reconstruction, bridge rails, sign
structures or sign replacements, overlay treatments, culvert repairs,
repairs related to bridge scour, damage repairs (unless it is long term
damage, such as along Route 1 in Big Sur)), are to facilities ancillary
to the state highways (rest stops, maintenance facilities, office
buildings, performance and monitoring), or projects that are primarily
environmental mitigation splits from other projects are not interesting
for the highway pages. Additionally, SHOPP projects that are unchanged
from entries already on the highway pages are not repeated (e.g.,
projects already in the 2024 SHOPP that are carried forward, modulo
significant amendments). Lastly, projects that support complete streets
or ADA or purely active transportation projects are generally not of
interest to the highway pages, as they do not impact routing.
Roundabouts, on the other hand, are interesting. Traffic signals and
turn bays are judgement calls.
Using this rationale, the following projects had
entries in the 2026 SHOPP that rose to the level of requiring updates to
their pages (search "2026 SHOPP"): Route 1, Route 4, I-5, I-8, Route 14,
I-15, Route 16, Route 29, Route 33, Route 37, Route 39, I-40, Route 49,
Route 58, Route 59, Route 70, Route 84, Route 89, Route 96, Route 99, US 101, Route 110, Route 116, Route 120, Route 121, Route 126, Route 140,
Route 154, Route 165, Route 190, Route 198, Route 211, Route 220, Route 246, Route 254, Route 267, Route 299, Route 371. Note that projects
currently active in the SHOPP from prior fiscal years, if they were just
in the summary table at the end, were not examined as there was no new
information.
Other Matters/Public Comment
There were no items of interest for this agenda item in the reviewed
minutes.
FREQUENTLY USED TERMS IN CTC MINUTES: California Transportation Commission (Commission or CTC),
California Department of Transportation (Department or Caltrans),
Regional Improvement Program (RIP), Interregional Improvement Program
(IIP), State Transportation Improvement
Program (STIP), State Highway Operation and Protection Program
(SHOPP), Traffic Congestion Relief Program (TCRP), Public
Transportation Account (PTA), Clean Air and Transportation Improvement
Act of 1990 (Proposition 116), High Speed
Passenger Train Bond Program (Proposition 1A), Highway Safety, Traffic
Reduction, Air Quality, and Port Security Bond Act of 2006
(Proposition 1B), Corridor Mobility Improvement Account (CMIA), State
Route 99 Bond Program (RTE or SR 99), Local
Bridge Seismic Retrofit Account (LBSRA), Trade Corridors Improvement
Fund (TCIF), Highway-Railroad Crossing Safety Account (HRCSA),
State-Local Partnership Program (SLPP), Traffic Light Synchronization
Program (TLSP), Letter of No Prejudice (LONP),
Environmental Phase (PA&ED), Design Phase (PS&E), Right of Way
(R/W), Fiscal Year (FY), Active Transportation Program (ATP),
Intercity Rail (ICR), California Aid to Airports Program (CAAP),
Acquisition & Development (A&D),
Transit and Inter-City Rail Capital Program (TIRCP), Transportation
Facilities Account (TFA), Trade Corridor Enhancement Program (TCEP),
Local Partnership Program (LPP), Local Streets and Roads Program
(LSRP), Solutions for Congested Corridors
Program (SCCP).
❦
2025 Changes
Change Log Index
© 1996-2024 Daniel P.
Faigin.
Maintained by: Daniel P. Faigin <webmaster@cahighways.org>.